Lochinvar 5 Sidewall direct venting, Vent/air termination sidewall, Determine location

Page 22
If using the alternate sidewall termination:

Installation & Operation Manual

3 Sidewall direct venting

Vent/air termination – sidewall

Figure 3-1APVC/CPVC/Centrotherm Sidewall Termination of Air and Vent

￿WARNING

￿WARNING

Follow instructions below when determining vent location to avoid possibility of severe personal injury, death, or substantial property damage.

A gas vent extending through an exterior wall shall not terminate adjacent to a wall or below building extensions such as eaves, parapets, balconies, or decks. Failure to comply could result in severe personal injury, death, or substantial property damage.

Note: Available in 6"

TO BOILER

INTAKE AIR

diameter only.

CONNECTION

FROM BOILER

 

VENT PIPE

 

CONNECTION

 

POSSIBLE ORIENTATIONS

12"

MIN

 

TO

 

OVER-

 

HANG

 

VENT / AIR

 

TERMINATION

 

12"

 

MIN

Determine location

Locate the vent/air terminations using the following guidelines:

1.The total length of piping for vent or air must not exceed the limits given in the General Venting Section on page 16 of this manual.

 

 

GRADE OR

 

 

SNOW LINE

Table 3A CPVC/PVC Sidewall Vent Kits

Model

Kit Number

Vent Size

1.0 - 1.5

KIT30047

6 inch vent

2.You must consider the surroundings when terminating

the vent and air:

a.Position the vent termination where vapors will 3. The air piping must terminate in a down-turned elbow

 

not damage nearby shrubs, plants or air

 

as shown in FIG. 3-1B. This arrangement avoids

 

conditioning equipment or be objectionable.

 

recirculation of flue products into the combustion air

b.

The flue products will form a noticeable plume as

 

stream.

 

 

they condense in cold air.

Avoid areas where the

4. The vent piping must

terminate in an elbow pointed

 

plume could obstruct window views.

 

 

outward or away from the air inlet, as shown in FIG. 3-1B.

c.

Prevailing winds could cause freezing of

 

 

 

Do not exceed the maximum lengths of the

 

condensate and water/ice buildup where flue

 

￿ WARNING

 

products impinge on building surfaces or plants.

 

 

outside vent piping shown in FIG.’s 3-1B

 

 

 

d.

Avoid possibility of accidental contact of flue

 

 

and 3-1C.

Excessive length exposed to the

 

products with people or pets.

 

 

 

outside could cause freezing of condensate

e.

Do not locate the terminations where wind eddies

 

 

in the vent pipe, resulting in potential boiler

 

could affect performance or cause recirculation,

 

 

shutdown.

 

 

such as

inside building

corners, near

adjacent

 

 

 

 

 

Figure 3-1BAlternate Sidewall Termination of Air and

 

buildings

or surfaces, window wells,

stairwells,

 

Vent w/Field Supplied Fittings

 

alcoves, courtyards, or other recessed areas.

 

 

 

 

 

￿WARNING

Sidewall vent and air inlet terminations must terminate in the same pressure zone.

f.Do not terminate above any door or window. Condensate can freeze, causing ice formations.

g.Locate or guard vent to prevent condensate damage to exterior finishes.

22

Image 22
Contents Save this manual for future reference Contents When servicing boiler Please read before proceedingSync How it works BlowersModels 1.0 1.3 Ratings SyncDetermine boiler location Installation must comply withCloset and alcove installations Before locating the boiler, check1Closet Installation Minimum Required Clearances Prevent combustion air contamination Provide air openings to roomFlooring and foundation Products to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet5Combustion Air Through Ducts Minimum Recommended Combustion AIR Supply to Equipment Room Direct venting options Sidewall Vent General ventingDirect venting options Vertical Vent Install vent and combustion air piping Air intake/vent connectionsRequirements for installation in Canada SizingMaterials Air inlet pipe materialsOptional room air Vent fittings Material Standard Vent pipe PrimerPolypropylene Centrotherm InnoFlue SW Duravent PolyproStainless steel vent Supplied with the vent systemVent/air termination sidewall Sidewall direct ventingDetermine location 2B Alternate Clearance to Gravity Air Inlets Prepare wall penetrations Found in this manualPrepare wall penetrations Alternate Field Supplied Options Multiple vent/air terminationsVent/air termination vertical Vertical direct ventingPrepare roof penetrations 3Vertical Terminations with Multiple Boilers Hydronic piping Near boiler piping connections Circulator sizingHot Water Generator pump sizing ExampleNear boiler piping components 5Single Boiler Primary/Secondary Piping Model Number of Units Manifold Pipe Sizes in Inches mm Connecting gas supply piping Gas connectionsNatural gas Propane GasGAS Piping Size Chart Check inlet gas supplyGas valve replacement Gas PressureInstallation must comply with Field wiringLine voltage connections Louver proving switch EnableOutdoor temperature sensor Flow switch field suppliedBoiler management system System supply sensor Wiring of the cascadeAlarm contacts Runtime contacts3Low Voltage Field Wiring Connections Condensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect/fill condensate system Check for gas leaksCheck thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneConfiguration of the cascade Set Hot Water Generator HW operationOperating information GeneralProtection features Outdoor reset operation, if used Boiler temperature regulationCascade HW operation with cascade Sequence of the cascadeNight Setback operation with cascade Sequence of operation Sync control module 1Status ScreenOperating information 2Main Menu Screen Owner maintenance Maintenance Maintenance and annual startupService technician See the Sync User’s Information Manual for InstructionsMaintenance Check expansion tank Flue vent system and air pipingCheck water system Check boiler relief valveCheck control settings Check ignition ground wiringCheck all boiler wiring Check flame signalCleaning boiler heat exchanger Model Kit Part Component Number DescriptionHandling ceramic fiber materials Niosh stated First AidDiagrams LOW Voltage 120 VAC High Voltage2Ladder DiagramPart 3Wiring Diagram Page
Related manuals
Manual 12 pages 30.87 Kb