Lochinvar 5 operation manual 2Main Menu Screen

Page 56

Installation & Operation Manual

10 Operating information

Use the Main Menu Screen (FIG. 10-2) to access the screens necessary to set temperatures, operating conditions, and monitor boiler operation.

The SYNC is equipped with a SMART TOUCH control system. All menu options are accessed by touching the screen with your finger or a stylus from a PDA.

Figure 10-2Main Menu Screen

The Main Screen allows navigation to eight (8) additional screens which are used to set temperatures, operating conditions, and monitor boiler operation. These screens are as follows:

Setup - Allows access to seven (7) other screens for the adjustment of the control parameters.

Cascade - Shows the status of multiple boilers connected together in a cascade arrangement.

Temps - Shows the temperatures measured by the individual sensors connected to the boiler.

Burners - Shows the status of the two (2) independent burner systems used in the boiler.

Building - Shows the information from a Building Integration System using Modbus Protocols.

Graphs - Allows the selection of items to be graphed on a chart.

History - Shows the operating and fault history of the two (2) control modules.

Service Mode - Allows the installer to control the fan speed of the individual control modules for the purposes of combustion analysis. Service Mode will override all other heat demands, however, all safeties will remain intact.

Navigation to the Main Screen can be accomplished by pressing the MAIN button at the bottom of the page.

Reference the SYNC Service Manual for more information regarding the eight (8) accessible screens.

Time - The time is displayed in the upper right-hand corner of the display. It is displayed in 24 hour format. Reference the night setback parameters in the SYNC Servie Manual for information regarding adjusting the date and time.

Status button - Pressing this button displays the Status Screen. This screen shows the current status of the SYNC boiler. Reference pages 54 - 55 for more information regarding this screen.

56

Image 56
Contents Save this manual for future reference Contents When servicing boiler Please read before proceedingSync How it works BlowersModels 1.0 1.3 Ratings SyncInstallation must comply with Closet and alcove installationsDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Flooring and foundation Provide air openings to roomPrevent combustion air contamination Areas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid When removing a boiler from existing common vent system Remove boiler from wood pallet5Combustion Air Through Ducts Minimum Recommended Combustion AIR Supply to Equipment Room Direct venting options Vertical Vent General ventingDirect venting options Sidewall Vent Install vent and combustion air piping Air intake/vent connectionsRequirements for installation in Canada SizingMaterials Air inlet pipe materialsOptional room air Material Standard Vent pipeVent fittings PrimerPolypropylene Centrotherm InnoFlue SW Duravent PolyproStainless steel vent Supplied with the vent systemDetermine location Sidewall direct ventingVent/air termination sidewall 2B Alternate Clearance to Gravity Air Inlets Prepare wall penetrations Found in this manualPrepare wall penetrations Alternate Field Supplied Options Multiple vent/air terminationsPrepare roof penetrations Vertical direct ventingVent/air termination vertical 3Vertical Terminations with Multiple Boilers Hydronic piping Near boiler piping connections Circulator sizingHot Water Generator pump sizing ExampleNear boiler piping components 5Single Boiler Primary/Secondary Piping Model Number of Units Manifold Pipe Sizes in Inches mm Connecting gas supply piping Gas connectionsNatural gas Propane GasGAS Piping Size Chart Check inlet gas supplyGas valve replacement Gas PressureLine voltage connections Field wiringInstallation must comply with Enable Outdoor temperature sensorLouver proving switch Flow switch field suppliedSystem supply sensor Wiring of the cascade Alarm contactsBoiler management system Runtime contacts3Low Voltage Field Wiring Connections Condensate disposal Condensate drainFreeze protection when used Start-upCheck/control water chemistry Fill and test water systemCheck for gas leaks Check thermostat circuitsInspect/fill condensate system Inspect/check condensate lines and fittingsFinal checks before starting the boiler Start the boilerIf boiler does not start correctly Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneConfiguration of the cascade Set Hot Water Generator HW operationOperating information GeneralProtection features Cascade Boiler temperature regulationOutdoor reset operation, if used Night Setback operation with cascade Sequence of the cascadeHW operation with cascade Sequence of operation Sync control module 1Status ScreenOperating information 2Main Menu Screen Maintenance Maintenance and annual startup Service technicianOwner maintenance See the Sync User’s Information Manual for InstructionsMaintenance Flue vent system and air piping Check water systemCheck expansion tank Check boiler relief valveCheck ignition ground wiring Check all boiler wiringCheck control settings Check flame signalCleaning boiler heat exchanger Model Kit Part Component Number DescriptionHandling ceramic fiber materials Niosh stated First AidDiagrams LOW Voltage 120 VAC High Voltage2Ladder DiagramPart 3Wiring Diagram Page
Related manuals
Manual 12 pages 30.87 Kb