Lochinvar 5 operation manual For Your Safety Read Before Operating

Page 46

Installation & Operation Manual

9 Start-up

Figure 9-2Operating Instructions

FOR YOUR SAFETY READ BEFORE OPERATING

WARNING: If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury, or loss of life.

A.This appliance does not have a pilot. It is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand.

B.BEFORE OPERATING smell all around the appliance area for gas. Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor.

WHAT TO DO IF YOU SMELL GAS

Do not try to light any appliance.

Do not touch any electric switch; do not use any phone in your building.

Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.

If you cannot reach your gas supplier, call the fire department.

C.Use only your hand to turn the gas control knob. Never use tools. If the handle will not turn by hand, don’t try to repair it, call a qualified service technician. Force or attempted repair may result in a fire or explosion.

D.Do not use this appliance if any part has been under water. Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water.

OPERATING INSTRUCTIONS

1.STOP! Read the safety information above on this label.

2.Set the thermostat to lowest setting.

3.Turn off all electric power to the appliance.

4.This appliance is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand.

5.Remove front door.

6.Turn gas shutoff valves counterclockwise to “OFF”. Handle will be perpendicular to pipe. Do not force.

7.Wait five (5) minutes to clear out any gas. If you then smell gas, STOP! Follow “B” in the safety information above this label. If you don’t smell gas, go to next step.

8.Turn gas shutoff valve clockwise to “ON”. Handle will be parallel to pipe.

9.Install top cover.

10.Turn on all electric power to appliance.

11.Set thermostat to desired setting.

12.If the appliance will not operate, follow the instructions “To Turn Off Gas To Appliance” and call your service technician or gas supplier.

TO TURN OFF GAS TO APPLIANCE

1.Set the thermostat to lowest setting.

2.Turn off all electric power to the appliance if service is to be performed.

3.Remove front door.

4.Turn gas shut off valves counterclockwise to “OFF”. Handle will be perpendicular to pipe. Do not force.

5.Install front door.

LBL20053 REV A

46

Image 46
Contents Save this manual for future reference Contents When servicing boiler Please read before proceedingSync How it works BlowersModels 1.0 1.3 Ratings SyncDetermine boiler location Installation must comply withCloset and alcove installations Before locating the boiler, check1Closet Installation Minimum Required Clearances Prevent combustion air contamination Provide air openings to roomFlooring and foundation Products to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet5Combustion Air Through Ducts Minimum Recommended Combustion AIR Supply to Equipment Room Direct venting options Sidewall Vent General ventingDirect venting options Vertical Vent Install vent and combustion air piping Air intake/vent connectionsRequirements for installation in Canada SizingMaterials Air inlet pipe materialsOptional room air Vent fittings Material StandardVent pipe PrimerPolypropylene Centrotherm InnoFlue SW Duravent PolyproStainless steel vent Supplied with the vent systemVent/air termination sidewall Sidewall direct ventingDetermine location 2B Alternate Clearance to Gravity Air Inlets Prepare wall penetrations Found in this manualPrepare wall penetrations Alternate Field Supplied Options Multiple vent/air terminationsVent/air termination vertical Vertical direct ventingPrepare roof penetrations 3Vertical Terminations with Multiple Boilers Hydronic piping Near boiler piping connections Circulator sizingHot Water Generator pump sizing ExampleNear boiler piping components 5Single Boiler Primary/Secondary Piping Model Number of Units Manifold Pipe Sizes in Inches mm Connecting gas supply piping Gas connectionsNatural gas Propane GasGAS Piping Size Chart Check inlet gas supplyGas valve replacement Gas PressureInstallation must comply with Field wiringLine voltage connections Louver proving switch EnableOutdoor temperature sensor Flow switch field suppliedBoiler management system System supply sensor Wiring of the cascadeAlarm contacts Runtime contacts3Low Voltage Field Wiring Connections Condensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect/fill condensate system Check for gas leaksCheck thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneConfiguration of the cascade Set Hot Water Generator HW operationOperating information GeneralProtection features Outdoor reset operation, if used Boiler temperature regulationCascade HW operation with cascade Sequence of the cascadeNight Setback operation with cascade Sequence of operation Sync control module 1Status ScreenOperating information 2Main Menu Screen Owner maintenance Maintenance Maintenance and annual startupService technician See the Sync User’s Information Manual for InstructionsMaintenance Check expansion tank Flue vent system and air pipingCheck water system Check boiler relief valveCheck control settings Check ignition ground wiringCheck all boiler wiring Check flame signalCleaning boiler heat exchanger Model Kit Part Component Number DescriptionHandling ceramic fiber materials Niosh stated First AidDiagrams LOW Voltage 120 VAC High Voltage2Ladder DiagramPart 3Wiring Diagram Page
Related manuals
Manual 12 pages 30.87 Kb

5 specifications

Lochinvar 5 is a cutting-edge residential boiler designed to meet the heating needs of modern homes while ensuring high efficiency and user convenience. As one of the latest offerings from Lochinvar, a trusted name in the heating industry, the Lochinvar 5 combines advanced technology with robust features that make it a top choice for homeowners and contractors alike.

One of the standout characteristics of the Lochinvar 5 is its impressive energy efficiency. It boasts an AFUE (Annual Fuel Utilization Efficiency) rating of up to 95%, which significantly reduces fuel consumption compared to traditional heating systems. This not only translates to lower energy bills for homeowners but also minimizes the environmental impact, aligning with the growing demand for sustainable energy solutions.

The Lochinvar 5 employs a highly efficient modulating burner technology that optimizes fuel usage based on real-time heating demand. This ensures that the boiler operates at peak efficiency, providing consistent warmth without unnecessary energy waste. The inclusion of advanced controls further enhances its performance, allowing users to adjust settings easily and monitor usage through a user-friendly digital display.

Durability and reliability are also paramount in the design of the Lochinvar 5. Constructed with high-quality materials, this boiler is built to withstand the rigors of daily use and provide long-lasting performance. Its compact design allows for flexible installation options, making it suitable for various residential settings, even where space is limited.

In addition to its impressive performance metrics, Lochinvar 5 is equipped with smart technology features that cater to the needs of modern consumers. Wi-Fi connectivity enables remote monitoring and control via a mobile app, giving homeowners the ability to adjust settings on the go. This feature not only enhances user convenience but also allows for proactive maintenance and alerts, helping to prevent potential issues before they arise.

Safety is a key consideration in the design of Lochinvar 5. It includes multiple safety features, such as a sealed combustion system that minimizes the risk of carbon monoxide leaks and an advanced monitoring system that ensures optimal operating conditions at all times.

In conclusion, the Lochinvar 5 stands out as an exceptional choice for those seeking a reliable, efficient, and smart residential heating solution. Its combination of advanced technologies, user-friendly features, and robust construction make it a leading option in the boiler market, ready to meet the demands of today’s homeowners. With an eye on energy efficiency and ease of use, Lochinvar 5 is well-equipped to provide comfortable, cost-effective heating for years to come.