Lochinvar 5 operation manual Material Standard, Vent pipe, Vent fittings, Primer

Page 19

Installation & Operation Manual

2 General venting (continued)

PVC/CPVC

This product has been approved for use with the PVC/CPVC vent materials listed in Table 2C.

Installing vent and air piping

1.

Work from the boiler to vent or air termination. Do not

 

exceed the lengths given in this manual for the air or vent

 

piping.

2.

Cut pipe to the required lengths and deburr the inside

 

and outside of the pipe ends.

￿WARNING

NOTICE

NOTICE

￿WARNING

￿WARNING

The vent connection to the appliance must be made with the starter CPVC pipe section provided with the appliance if PVC/CPVC vent is to be used. The field provided vent fittings must be cemented to the CPVC pipe section using an “All Purpose Cement” suitable for PVC and CPVC pipe. Use only the vent materials, primer, and cement specified in Table 2C to make the vent connections. Failure to follow this warning could result in fire, personal injury, or death.

Use only cleaners, primers, and solvents that are approved for the materials which are joined together.

All PVC vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of a 1/4 inch per foot back to the boiler (to allow drainage of condensate).

Insulation should not be used on PVC or CPVC venting materials. The use of insulation will cause increased vent wall temperatures, which could result in vent pipe failure.

For all installations, the first ten (10) equivalent feet of vent must be CPVC or stainless steel (see FIG. 2-6). Failure to follow this warning could result in fire, personal inury, or death.

3. Chamfer outside of each pipe end to ensure even

 

cement distribution when joining.

4. Clean all pipe ends and fittings using a clean dry rag.

 

(Moisture will retard curing and dirt or grease will

 

prevent adhesion.)

5.

Dry fit vent or air piping to ensure proper fit up before

 

assembling any joint. The pipe should go a third to

 

two-thirds into the fitting to ensure proper sealing after

 

cement is applied.

6.

Priming and Cementing:

 

a.

Handle fittings and pipes carefully to prevent

 

 

contamination of surfaces.

 

b.

Apply a liberal even coat of primer to the fitting

 

 

socket and to the pipe end to approximately 1/2"

 

 

beyond the socket depth.

 

c.

Apply a second primer coat to the fitting socket.

 

d.

While primer is still wet, apply an even coat of

 

 

approved cement to the pipe equal to the depth of

 

 

the fitting socket along with an even coat of

 

 

approved cement to the fitting socket.

 

e.

Apply a second coat of cement to the pipe.

 

f.

While the cement is still wet, insert the pipe into

 

 

the fitting, if possible twist the pipe a 1/4 turn as

 

 

you insert it. NOTE: If voids are present,

 

 

sufficient cement was not applied and joint could

 

 

be defective.

 

g.

Wipe excess cement from the joint removing ring or

 

 

beads as it will needlessly soften the pipe.

Table 2C PVC/CPVC Vent Pipe, and Fittings

Approved PVC/CPVC Vent Pipe and Fittings

Item

Material

Standard

 

PVC Schedule 40, 80

ANSI/ASTM D1785

Vent pipe

PVC - DWV

ANSI/ASTM D2665

 

CPVC Schedule 40, 80

ANSI/ASTM F441

 

PVC Schedule 40

ANSI/ASTM D2466

Vent fittings

PVC Schedule 80

ANSI/ASTM D2467

 

CPVC Schedule 80

ANSI/ASTM F439

Pipe Cement /

PVC

ANSI/ASTM D2564

Primer

CPVC

ANSI/ASTM F493

NOTICE: DO NOT USE CELLULAR (FOAM) CORE PIPE

NOTE: In Canada, CPVC and PVC vent pipe, fittings and cement/ primer must be ULC-S636 certified.

Figure 2-6Near Boiler PVC/CPVC Venting

CPVC ELBOW

CPVC PIPE

5'

19

Image 19
Contents Save this manual for future reference Contents Please read before proceeding When servicing boilerBlowers Sync How it worksModels 1.0 1.3 Sync RatingsBefore locating the boiler, check Installation must comply withCloset and alcove installations Determine boiler location1Closet Installation Minimum Required Clearances Prevent combustion air contamination Provide air openings to roomFlooring and foundation Products to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants Remove boiler from wood pallet When removing a boiler from existing common vent system5Combustion Air Through Ducts Minimum Recommended Combustion AIR Supply to Equipment Room Direct venting options Sidewall Vent General ventingDirect venting options Vertical Vent Air intake/vent connections Install vent and combustion air pipingSizing Requirements for installation in CanadaAir inlet pipe materials MaterialsOptional room air Primer Material StandardVent pipe Vent fittingsCentrotherm InnoFlue SW Duravent Polypro PolypropyleneSupplied with the vent system Stainless steel ventVent/air termination sidewall Sidewall direct ventingDetermine location 2B Alternate Clearance to Gravity Air Inlets Found in this manual Prepare wall penetrationsMultiple vent/air terminations Prepare wall penetrations Alternate Field Supplied OptionsVent/air termination vertical Vertical direct ventingPrepare roof penetrations 3Vertical Terminations with Multiple Boilers Hydronic piping Circulator sizing Near boiler piping connectionsExample Hot Water Generator pump sizingNear boiler piping components 5Single Boiler Primary/Secondary Piping Model Number of Units Manifold Pipe Sizes in Inches mm Gas connections Connecting gas supply pipingPropane Gas Natural gasCheck inlet gas supply GAS Piping Size ChartGas Pressure Gas valve replacementInstallation must comply with Field wiringLine voltage connections Flow switch field supplied EnableOutdoor temperature sensor Louver proving switchRuntime contacts System supply sensor Wiring of the cascadeAlarm contacts Boiler management system3Low Voltage Field Wiring Connections Condensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistryInspect/check condensate lines and fittings Check for gas leaksCheck thermostat circuits Inspect/fill condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctlyFor Your Safety Read Before Operating Natural Gas Propane Set space heating operationSet Hot Water Generator HW operation Configuration of the cascadeGeneral Operating informationProtection features Outdoor reset operation, if used Boiler temperature regulationCascade HW operation with cascade Sequence of the cascadeNight Setback operation with cascade Sequence of operation 1Status Screen Sync control moduleOperating information 2Main Menu Screen See the Sync User’s Information Manual for Instructions Maintenance Maintenance and annual startupService technician Owner maintenanceMaintenance Check boiler relief valve Flue vent system and air pipingCheck water system Check expansion tankCheck flame signal Check ignition ground wiringCheck all boiler wiring Check control settingsModel Kit Part Component Number Description Cleaning boiler heat exchangerNiosh stated First Aid Handling ceramic fiber materialsLOW Voltage 120 VAC High Voltage Diagrams2Ladder DiagramPart 3Wiring Diagram Page
Related manuals
Manual 12 pages 30.87 Kb

5 specifications

Lochinvar 5 is a cutting-edge residential boiler designed to meet the heating needs of modern homes while ensuring high efficiency and user convenience. As one of the latest offerings from Lochinvar, a trusted name in the heating industry, the Lochinvar 5 combines advanced technology with robust features that make it a top choice for homeowners and contractors alike.

One of the standout characteristics of the Lochinvar 5 is its impressive energy efficiency. It boasts an AFUE (Annual Fuel Utilization Efficiency) rating of up to 95%, which significantly reduces fuel consumption compared to traditional heating systems. This not only translates to lower energy bills for homeowners but also minimizes the environmental impact, aligning with the growing demand for sustainable energy solutions.

The Lochinvar 5 employs a highly efficient modulating burner technology that optimizes fuel usage based on real-time heating demand. This ensures that the boiler operates at peak efficiency, providing consistent warmth without unnecessary energy waste. The inclusion of advanced controls further enhances its performance, allowing users to adjust settings easily and monitor usage through a user-friendly digital display.

Durability and reliability are also paramount in the design of the Lochinvar 5. Constructed with high-quality materials, this boiler is built to withstand the rigors of daily use and provide long-lasting performance. Its compact design allows for flexible installation options, making it suitable for various residential settings, even where space is limited.

In addition to its impressive performance metrics, Lochinvar 5 is equipped with smart technology features that cater to the needs of modern consumers. Wi-Fi connectivity enables remote monitoring and control via a mobile app, giving homeowners the ability to adjust settings on the go. This feature not only enhances user convenience but also allows for proactive maintenance and alerts, helping to prevent potential issues before they arise.

Safety is a key consideration in the design of Lochinvar 5. It includes multiple safety features, such as a sealed combustion system that minimizes the risk of carbon monoxide leaks and an advanced monitoring system that ensures optimal operating conditions at all times.

In conclusion, the Lochinvar 5 stands out as an exceptional choice for those seeking a reliable, efficient, and smart residential heating solution. Its combination of advanced technologies, user-friendly features, and robust construction make it a leading option in the boiler market, ready to meet the demands of today’s homeowners. With an eye on energy efficiency and ease of use, Lochinvar 5 is well-equipped to provide comfortable, cost-effective heating for years to come.