Lochinvar 5 operation manual 2B Alternate Clearance to Gravity Air Inlets

Page 23

Installation & Operation Manual

3 Sidewall direct venting (continued)

Vent/air termination – sidewall

Figure 3-1CAlternate Stainless Steel Sidewall Termination w/Field Supplied Fittings

NOTICE PVC/CPVC or ABS is acceptable air inlet pipe material.

Figure 3-2AClearance to Gravity Air Inlets

12"

MIN.

VENT / AIR

TO BOILER INTAKE AIR CONNECTION

FROM BOILER VENT PIPE CONNECTION

12" (305 MM) MIN 15" (381 MM) MAX

TERMINATION

12" MIN.

12" MIN.

Figure 3-2BAlternate Clearance to Gravity Air

Inlets

12" (305 MM) MIN

Table 3B Stainless Steel Sidewall Vent Kits

Model

Kit Number

Vent Size

1.0 - 1.5

KIT30028

6 inch vent

(Stainless Steel)

 

 

1.3 - 1.5

KIT30029

7 inch vent

(Stainless Steel)

 

 

5.Maintain clearances as shown in FIG.’s 3-1A thru 3-4B, pages 22 and 24. Also maintain the following:

a.Vent must terminate:

At least 6 feet (1.8 m) from adjacent walls.

No closer than 12 inches (305 mm) below roof overhang.

At least 7 feet (2.1 m) above any public walkway.

At least 3 feet (.9 m) above any forced air intake within 10 feet (3 m).

No closer than 12 inches (305 mm) below or horizontally from any door or window or any other gravity air inlet.

b.Air inlet must terminate at least 12 inches (305 m) above grade or snow line; at least 12 inches (305 mm) below the vent termination; and the vent pipe must not extend more than 24 inches (610 mm) vertically outside the building as shown in FIG.’s 3-1B and 3-1C.

c.Do not terminate closer than 4 feet (1.2 m) horizontally from any electric meter, gas meter, regulator, relief valve, or other equipment. Never terminate above or below any of these within 4 feet (1.2 m) horizontally.

6.Locate terminations so they are not likely to be damaged by foreign objects, such as stones or balls, or subject to buildup of leaves or sediment.

w/Field Supplied Fittings

12” (305 MM)

MIN

BIRD

SCREEN

(TYPICAL)

12” (305 MM)

MIN

12” (305 MM)

MIN

Figure 3-3AClearance to Forced Air Inlets

IF LESS

THAN 10’

VENT / AIR

36"

TERMINATION

MIN.

 

FORCED AIR

INLET

7' MIN. ABOVE ANY PUBLIC WALKWAY

23

Image 23
Contents Save this manual for future reference Contents Please read before proceeding When servicing boilerBlowers Sync How it worksModels 1.0 1.3 Sync RatingsBefore locating the boiler, check Installation must comply withCloset and alcove installations Determine boiler location1Closet Installation Minimum Required Clearances Flooring and foundation Provide air openings to roomPrevent combustion air contamination Areas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid Remove boiler from wood pallet When removing a boiler from existing common vent system5Combustion Air Through Ducts Minimum Recommended Combustion AIR Supply to Equipment Room Direct venting options Vertical Vent General ventingDirect venting options Sidewall Vent Air intake/vent connections Install vent and combustion air pipingSizing Requirements for installation in CanadaAir inlet pipe materials MaterialsOptional room air Primer Material StandardVent pipe Vent fittings Centrotherm InnoFlue SW Duravent Polypro PolypropyleneSupplied with the vent system Stainless steel ventDetermine location Sidewall direct ventingVent/air termination sidewall 2B Alternate Clearance to Gravity Air Inlets Found in this manual Prepare wall penetrationsMultiple vent/air terminations Prepare wall penetrations Alternate Field Supplied OptionsPrepare roof penetrations Vertical direct ventingVent/air termination vertical 3Vertical Terminations with Multiple Boilers Hydronic piping Circulator sizing Near boiler piping connectionsExample Hot Water Generator pump sizingNear boiler piping components 5Single Boiler Primary/Secondary Piping Model Number of Units Manifold Pipe Sizes in Inches mm Gas connections Connecting gas supply pipingPropane Gas Natural gasCheck inlet gas supply GAS Piping Size ChartGas Pressure Gas valve replacementLine voltage connections Field wiringInstallation must comply with Flow switch field supplied EnableOutdoor temperature sensor Louver proving switchRuntime contacts System supply sensor Wiring of the cascadeAlarm contacts Boiler management system3Low Voltage Field Wiring Connections Condensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistryInspect/check condensate lines and fittings Check for gas leaksCheck thermostat circuits Inspect/fill condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctlyFor Your Safety Read Before Operating Natural Gas Propane Set space heating operationSet Hot Water Generator HW operation Configuration of the cascadeGeneral Operating informationProtection features Cascade Boiler temperature regulationOutdoor reset operation, if used Night Setback operation with cascade Sequence of the cascadeHW operation with cascade Sequence of operation 1Status Screen Sync control moduleOperating information 2Main Menu Screen See the Sync User’s Information Manual for Instructions Maintenance Maintenance and annual startupService technician Owner maintenanceMaintenance Check boiler relief valve Flue vent system and air pipingCheck water system Check expansion tankCheck flame signal Check ignition ground wiringCheck all boiler wiring Check control settingsModel Kit Part Component Number Description Cleaning boiler heat exchangerNiosh stated First Aid Handling ceramic fiber materialsLOW Voltage 120 VAC High Voltage Diagrams2Ladder DiagramPart 3Wiring Diagram Page
Related manuals
Manual 12 pages 30.87 Kb