Lochinvar 5 operation manual Maintenance

Page 58

Installation & Operation Manual

11 Maintenance

￿WARNING

￿WARNING

￿WARNING

Follow the service and maintenance procedures given throughout this manual and in component literature shipped with the boiler. Failure to perform the service and maintenance could result in damage to the boiler or system. Failure to follow the directions in this manual and component literature could result in severe personal injury, death, or substantial property damage.

The boiler should be inspected annually only by a qualified service technician. In addition, the maintenance and care of the boiler designated in Table 11A and explained on the following pages must be performed to assure maximum boiler efficiency and reliability. Failure to service and maintain the boiler and system could result in equipment failure.

Electrical shock hazard – Turn off power to the boiler before any service operation on the boiler except as noted otherwise in this instruction manual. Failure to turn off electrical power could result in electrical shock, causing severe personal injury or death.

Address reported problems

Figure 11-1Condensate Trap

1.Inspect any problems reported by the owner and correct before proceeding.

Inspect boiler area

1.Verify that boiler area is free of any combustible materials, gasoline and other flammable vapors and liquids.

2.Verify that air intake area is free of any of the contaminants listed in Section 1 of this manual. If any of these are present in the boiler intake air vicinity, they must be removed. If they cannot be removed, reinstall the air and vent lines per this manual.

Inspect boiler interior

PVC TEE ASSEMBLY (FACTORY SUPPLIED)

TO FLOOR

DRAIN

2” PVC CAP WITH

BLOCKED DRAIN SWITCH

RETAINING

SCREW

CONDENSATE FROM HEAT EXCHANGER

1.Remove the front access cover and inspect the interior of the boiler.

2.Vacuum any sediment from inside the boiler and components. Remove any obstructions.

Clean condensate trap

1. Inspect the condensate drain line, condensate PVC

fittings, and condensate trap.

￿WARNING The condensate trap must be filled with water during all times of boiler operation

to avoid flue gas emission from the condensate drain line. Failure to fill the trap could result in severe personal injury or death.

Check all piping for leaks

2.

Remove the PVC cap retaining screw from the PVC cap

 

(FIG. 11-1).

3.

Remove the 2 inch PVC cap with the switch located at the

 

top of the trap (FIG. 11-1).

4.

Remove any sediment in the trap.

5.

Fill with fresh water until the water begins to pour out of

￿WARNING

Eliminate all system or boiler leaks. Continual fresh makeup water will reduce boiler life. Minerals can build up in sections, reducing heat transfer, overheating heat exchanger, and causing heat exchanger failure. Leaking water may also cause severe property damage.

 

the drain.

6.

Replace the cap. Press the cap onto the trap until the cap

 

makes contact with the drain.

7.

Replace the retaining screw.

1.Inspect all water and gas piping and verify to be leak free.

2.Look for signs of leaking lines and correct any problems found.

3.Check gas line using the procedure found in Section 6 - Gas Connections.

58

Image 58
Contents Save this manual for future reference Contents When servicing boiler Please read before proceedingSync How it works BlowersModels 1.0 1.3 Ratings SyncDetermine boiler location Installation must comply withCloset and alcove installations Before locating the boiler, check1Closet Installation Minimum Required Clearances Prevent combustion air contamination Provide air openings to roomFlooring and foundation Products to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet5Combustion Air Through Ducts Minimum Recommended Combustion AIR Supply to Equipment Room Direct venting options Sidewall Vent General ventingDirect venting options Vertical Vent Install vent and combustion air piping Air intake/vent connectionsRequirements for installation in Canada SizingMaterials Air inlet pipe materialsOptional room air Vent fittings Material StandardVent pipe PrimerPolypropylene Centrotherm InnoFlue SW Duravent PolyproStainless steel vent Supplied with the vent systemVent/air termination sidewall Sidewall direct ventingDetermine location 2B Alternate Clearance to Gravity Air Inlets Prepare wall penetrations Found in this manualPrepare wall penetrations Alternate Field Supplied Options Multiple vent/air terminationsVent/air termination vertical Vertical direct ventingPrepare roof penetrations 3Vertical Terminations with Multiple Boilers Hydronic piping Near boiler piping connections Circulator sizingHot Water Generator pump sizing ExampleNear boiler piping components 5Single Boiler Primary/Secondary Piping Model Number of Units Manifold Pipe Sizes in Inches mm Connecting gas supply piping Gas connectionsNatural gas Propane GasGAS Piping Size Chart Check inlet gas supplyGas valve replacement Gas PressureInstallation must comply with Field wiringLine voltage connections Louver proving switch EnableOutdoor temperature sensor Flow switch field suppliedBoiler management system System supply sensor Wiring of the cascadeAlarm contacts Runtime contacts3Low Voltage Field Wiring Connections Condensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect/fill condensate system Check for gas leaksCheck thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneConfiguration of the cascade Set Hot Water Generator HW operationOperating information GeneralProtection features Outdoor reset operation, if used Boiler temperature regulationCascade HW operation with cascade Sequence of the cascadeNight Setback operation with cascade Sequence of operation Sync control module 1Status ScreenOperating information 2Main Menu Screen Owner maintenance Maintenance Maintenance and annual startupService technician See the Sync User’s Information Manual for InstructionsMaintenance Check expansion tank Flue vent system and air pipingCheck water system Check boiler relief valveCheck control settings Check ignition ground wiringCheck all boiler wiring Check flame signalCleaning boiler heat exchanger Model Kit Part Component Number DescriptionHandling ceramic fiber materials Niosh stated First AidDiagrams LOW Voltage 120 VAC High Voltage2Ladder DiagramPart 3Wiring Diagram Page
Related manuals
Manual 12 pages 30.87 Kb

5 specifications

Lochinvar 5 is a cutting-edge residential boiler designed to meet the heating needs of modern homes while ensuring high efficiency and user convenience. As one of the latest offerings from Lochinvar, a trusted name in the heating industry, the Lochinvar 5 combines advanced technology with robust features that make it a top choice for homeowners and contractors alike.

One of the standout characteristics of the Lochinvar 5 is its impressive energy efficiency. It boasts an AFUE (Annual Fuel Utilization Efficiency) rating of up to 95%, which significantly reduces fuel consumption compared to traditional heating systems. This not only translates to lower energy bills for homeowners but also minimizes the environmental impact, aligning with the growing demand for sustainable energy solutions.

The Lochinvar 5 employs a highly efficient modulating burner technology that optimizes fuel usage based on real-time heating demand. This ensures that the boiler operates at peak efficiency, providing consistent warmth without unnecessary energy waste. The inclusion of advanced controls further enhances its performance, allowing users to adjust settings easily and monitor usage through a user-friendly digital display.

Durability and reliability are also paramount in the design of the Lochinvar 5. Constructed with high-quality materials, this boiler is built to withstand the rigors of daily use and provide long-lasting performance. Its compact design allows for flexible installation options, making it suitable for various residential settings, even where space is limited.

In addition to its impressive performance metrics, Lochinvar 5 is equipped with smart technology features that cater to the needs of modern consumers. Wi-Fi connectivity enables remote monitoring and control via a mobile app, giving homeowners the ability to adjust settings on the go. This feature not only enhances user convenience but also allows for proactive maintenance and alerts, helping to prevent potential issues before they arise.

Safety is a key consideration in the design of Lochinvar 5. It includes multiple safety features, such as a sealed combustion system that minimizes the risk of carbon monoxide leaks and an advanced monitoring system that ensures optimal operating conditions at all times.

In conclusion, the Lochinvar 5 stands out as an exceptional choice for those seeking a reliable, efficient, and smart residential heating solution. Its combination of advanced technologies, user-friendly features, and robust construction make it a leading option in the boiler market, ready to meet the demands of today’s homeowners. With an eye on energy efficiency and ease of use, Lochinvar 5 is well-equipped to provide comfortable, cost-effective heating for years to come.