Lochinvar 5 Final checks before starting the boiler, Start the boiler, Check system and boiler

Page 45

9 Start-up(continued)

Final checks before starting the boiler

Read the SYNC Service Manual to familiarize yourself

with SMART TOUCH control module operation. Read

this manual, page 46 for proper steps to start boiler.

Verify the boiler and system are full of water and all

system components are correctly set for operation.

Verify the preparation procedures of Section 9, pages 43

and 44 have been completed.

Fill the vent condensate trap with water (removing the

retaining screw in order to remove the 2 inch (50.8 mm)

PVC cap with the switch located at the top of the trap).

Installation & Operation Manual

Check vent piping and air piping

1.Check for gastight seal at every connection, seam of air piping, and vent piping.

￿WARNING Venting system must be sealed gastight to prevent flue gas spillage and carbon

monoxide emissions, which will result in severe personal injury or death.

Check gas piping

1.Check around the boiler for gas odor following the procedure on page 34 of this manual (connecting gas supply piping).

Replace the cap. Press the cap onto the trap until the

cap makes contact with the drain. Replace the retaining

screw.

Verify electrical connections are correct and securely

attached.

Inspect vent piping and air piping for signs of deterioration

￿WARNING

If you discover evidence of any gas leak, shut down the boiler at once. Find the leak source with a bubble test and repair immediately. Do not start the boiler again until corrected. Failure to comply could result in severe personal injury, death, or substantial property damage.

from corrosion, physical damage or sagging. Verify air

piping and vent piping are intact and correctly installed

per this manual.

Start the boiler

1.Read and follow the Operating instructions in FIG. 9-2, page 46.

If boiler does not start correctly

1.Check for loose connections, blown fuse or service switch off?

2.Is external limit control (if used) open? Is boiler water temperature above 200°F (93°C)?

3.Is thermostat set below room temperature?

4.Is gas turned on at meter or boiler?

5.Is incoming gas pressure less than 4 inches w.c. (.99 kPa)?

If none of the above corrects the problem, refer to the Troubleshooting Section of the SYNC Service Manual.

Check system and boiler

Check water piping

1.Check system piping for leaks. If found, shut down the boiler and repair immediately. (See WARNINGS on pages 43 and 44 (startup) regarding failure to repair leaks.)

2.Vent any remaining air from the system using manual vents. Air in the system will interfere with circulation and cause heat distribution problems and noise.

Check flame and combustion

1.Turn the main power off to the boiler by placing the “On/Off” switch in the OFF position.

2.Remove the flue temperature sensors from the flue pipe connections. Note: Combustion measurements will be made at this point.

3.Turn the main power on to the boiler by placing the “On/Off” switch in the ON position.

45

Image 45
Contents Save this manual for future reference Contents Please read before proceeding When servicing boilerBlowers Sync How it worksModels 1.0 1.3 Sync RatingsCloset and alcove installations Installation must comply withDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Provide air openings to room Prevent combustion air contaminationFlooring and foundation When using an existing vent system to install a new boiler Products to avoidAreas likely to have contaminants Remove boiler from wood pallet When removing a boiler from existing common vent system5Combustion Air Through Ducts Minimum Recommended Combustion AIR Supply to Equipment Room General venting Direct venting options Sidewall VentDirect venting options Vertical Vent Air intake/vent connections Install vent and combustion air pipingSizing Requirements for installation in CanadaAir inlet pipe materials MaterialsOptional room air Vent pipe Material StandardVent fittings PrimerCentrotherm InnoFlue SW Duravent Polypro PolypropyleneSupplied with the vent system Stainless steel ventSidewall direct venting Vent/air termination sidewallDetermine location 2B Alternate Clearance to Gravity Air Inlets Found in this manual Prepare wall penetrationsMultiple vent/air terminations Prepare wall penetrations Alternate Field Supplied OptionsVertical direct venting Vent/air termination verticalPrepare roof penetrations 3Vertical Terminations with Multiple Boilers Hydronic piping Circulator sizing Near boiler piping connectionsExample Hot Water Generator pump sizingNear boiler piping components 5Single Boiler Primary/Secondary Piping Model Number of Units Manifold Pipe Sizes in Inches mm Gas connections Connecting gas supply pipingPropane Gas Natural gasCheck inlet gas supply GAS Piping Size ChartGas Pressure Gas valve replacementField wiring Installation must comply withLine voltage connections Outdoor temperature sensor EnableLouver proving switch Flow switch field suppliedAlarm contacts System supply sensor Wiring of the cascadeBoiler management system Runtime contacts3Low Voltage Field Wiring Connections Condensate drain Condensate disposalStart-up Freeze protection when usedCheck/control water chemistry Fill and test water systemCheck thermostat circuits Check for gas leaksInspect/fill condensate system Inspect/check condensate lines and fittingsStart the boiler Final checks before starting the boilerIf boiler does not start correctly Check system and boilerFor Your Safety Read Before Operating Natural Gas Propane Set space heating operationSet Hot Water Generator HW operation Configuration of the cascadeGeneral Operating informationProtection features Boiler temperature regulation Outdoor reset operation, if usedCascade Sequence of the cascade HW operation with cascadeNight Setback operation with cascade Sequence of operation 1Status Screen Sync control moduleOperating information 2Main Menu Screen Service technician Maintenance Maintenance and annual startupOwner maintenance See the Sync User’s Information Manual for InstructionsMaintenance Check water system Flue vent system and air pipingCheck expansion tank Check boiler relief valveCheck all boiler wiring Check ignition ground wiringCheck control settings Check flame signalModel Kit Part Component Number Description Cleaning boiler heat exchangerNiosh stated First Aid Handling ceramic fiber materialsLOW Voltage 120 VAC High Voltage Diagrams2Ladder DiagramPart 3Wiring Diagram Page
Related manuals
Manual 12 pages 30.87 Kb

5 specifications

Lochinvar 5 is a cutting-edge residential boiler designed to meet the heating needs of modern homes while ensuring high efficiency and user convenience. As one of the latest offerings from Lochinvar, a trusted name in the heating industry, the Lochinvar 5 combines advanced technology with robust features that make it a top choice for homeowners and contractors alike.

One of the standout characteristics of the Lochinvar 5 is its impressive energy efficiency. It boasts an AFUE (Annual Fuel Utilization Efficiency) rating of up to 95%, which significantly reduces fuel consumption compared to traditional heating systems. This not only translates to lower energy bills for homeowners but also minimizes the environmental impact, aligning with the growing demand for sustainable energy solutions.

The Lochinvar 5 employs a highly efficient modulating burner technology that optimizes fuel usage based on real-time heating demand. This ensures that the boiler operates at peak efficiency, providing consistent warmth without unnecessary energy waste. The inclusion of advanced controls further enhances its performance, allowing users to adjust settings easily and monitor usage through a user-friendly digital display.

Durability and reliability are also paramount in the design of the Lochinvar 5. Constructed with high-quality materials, this boiler is built to withstand the rigors of daily use and provide long-lasting performance. Its compact design allows for flexible installation options, making it suitable for various residential settings, even where space is limited.

In addition to its impressive performance metrics, Lochinvar 5 is equipped with smart technology features that cater to the needs of modern consumers. Wi-Fi connectivity enables remote monitoring and control via a mobile app, giving homeowners the ability to adjust settings on the go. This feature not only enhances user convenience but also allows for proactive maintenance and alerts, helping to prevent potential issues before they arise.

Safety is a key consideration in the design of Lochinvar 5. It includes multiple safety features, such as a sealed combustion system that minimizes the risk of carbon monoxide leaks and an advanced monitoring system that ensures optimal operating conditions at all times.

In conclusion, the Lochinvar 5 stands out as an exceptional choice for those seeking a reliable, efficient, and smart residential heating solution. Its combination of advanced technologies, user-friendly features, and robust construction make it a leading option in the boiler market, ready to meet the demands of today’s homeowners. With an eye on energy efficiency and ease of use, Lochinvar 5 is well-equipped to provide comfortable, cost-effective heating for years to come.