9 Start-up(continued)

Check flame and combustion (continued)

4.Navigate to the Service Mode Screen from the Status Screen by pressing the MAIN button and then the SERVICE MODE button.

5.On the Service Screen place Heat Exchanger 1 into operation by selecting Heat Exchanger 1 with the SELECT button and turning the heat exchanger on by pressing the ON/OFF button (OFF indicates that the heat exchanger is off and ON indicates that the heat exchanger should be firing).

6.Insert the probe from a combustion analyzer into the hole left by the removal of the flue temperature sensor.

Note: Heat Exchanger 1 is the top heat exchanger; please ensure the probe is in the top flue sensor location.

7.Once the heat exchanger has modulated up to full fire measure the combustion. The values should be in the range listed in Table 9A below. CO levels should

be less than 200 ppm

for a properly

installed unit.

If the combustion is not within range reference the

Troubleshooting Section in the SYNC Service Manual for

possible causes and corrective actions.

 

 

Table 9A Flue Products Chart

 

 

 

 

 

 

 

Natural Gas

Propane

 

 

 

 

 

 

 

CO2

O2

CO2

 

O2

 

8.0% - 10%

3.0% - 6.5%

9.0% - 11%

 

4.1% - 6.9%

 

 

 

 

 

 

 

8.Once the Heat Exchanger 1 analysis is complete, test the safety shutoff device by turning the manual shutoff valve to the OFF position and ensuring that Heat Exchanger 1 shuts down and registers an alarm. Open the manual shutoff valve, reset the control, and return to Service Mode.

9.Repeat the same procedure for Heat Exchanger 2 by selecting Heat Exchanger 2 while on the Service Mode Screen. Be certain to insert the probe from the combustion analyzer into the Heat Exchanger 2 flue temperature sensor location.

10.Turn the main power off to the boiler and replace the flue temperature sensor into the flue pipe connection.

11.Place the boiler back into normal operation.

￿WARNING You must replace the flue gas temperature sensor to prevent flue gas spillage into

the room. Failure to comply could result in severe personal injury, death, or substantial property damage.

Installation & Operation Manual

Set space heating operation

Verify space heat circulator mode

The Space Heating Mode controls the system pump (if connected), and both boiler pumps. When the SMART TOUCH control receives a space heating call for heat, it turns on the system pump. If the boiler is not heating an indirect HW (Hot Water) tank, it also turns on the boiler pump. After the space heating call for heat ends, the system pump continues to run for a short period of time. If the boiler pump was running, it continues to run for a short period of time as well. These pump delays are factory set to 30 seconds. If different delays are desired, the appropriate parameters in the control must be changed. See the SYNC Service Manual for a detailed explanation of this procedure.

Set space heating set point temperature

During normal operation, space heating set point temperatures can be adjusted from the Set Points Menu. Press the following buttons to navigate to the Set Points Menu from the Status Screen:

>> >>

1.To change a set point, press the SELECT button next to the user set point parameter.

2.The first time the user set point parameter is accessed, you will be required to enter the user password. The user password is 0704.

3.Using the keypad, enter the password and then press the OK button. If the password is not entered correctly, the screen will revert to the Parameter List Screen and you will not be able to adjust the set point. If a digit has been entered incorrectly, press the left arrow key on the keypad to back the digit up. If the password has been entered correctly, the Parameter Change Screen will appear. The Parameter Change Screen will display the set point being changed, the previous setting of the set point, and adjustment buttons.

4.To adjust the set point, press the + or - buttons to change the value being displayed.

5.Once the set point has been adjusted to the desired setting press the APPLY button to change the set point and return to the Parameter List Screen.

47

Image 47
Contents Save this manual for future reference Contents Please read before proceeding When servicing boilerBlowers Sync How it worksModels 1.0 1.3 Sync RatingsBefore locating the boiler, check Installation must comply withCloset and alcove installations Determine boiler location1Closet Installation Minimum Required Clearances Flooring and foundation Provide air openings to roomPrevent combustion air contamination Areas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid Remove boiler from wood pallet When removing a boiler from existing common vent system5Combustion Air Through Ducts Minimum Recommended Combustion AIR Supply to Equipment Room Direct venting options Vertical Vent General ventingDirect venting options Sidewall Vent Air intake/vent connections Install vent and combustion air pipingSizing Requirements for installation in CanadaAir inlet pipe materials MaterialsOptional room air Primer Material StandardVent pipe Vent fittingsCentrotherm InnoFlue SW Duravent Polypro PolypropyleneSupplied with the vent system Stainless steel ventDetermine location Sidewall direct ventingVent/air termination sidewall 2B Alternate Clearance to Gravity Air Inlets Found in this manual Prepare wall penetrationsMultiple vent/air terminations Prepare wall penetrations Alternate Field Supplied OptionsPrepare roof penetrations Vertical direct ventingVent/air termination vertical 3Vertical Terminations with Multiple Boilers Hydronic piping Circulator sizing Near boiler piping connectionsExample Hot Water Generator pump sizingNear boiler piping components 5Single Boiler Primary/Secondary Piping Model Number of Units Manifold Pipe Sizes in Inches mm Gas connections Connecting gas supply pipingPropane Gas Natural gasCheck inlet gas supply GAS Piping Size ChartGas Pressure Gas valve replacementLine voltage connections Field wiringInstallation must comply with Flow switch field supplied EnableOutdoor temperature sensor Louver proving switchRuntime contacts System supply sensor Wiring of the cascadeAlarm contacts Boiler management system3Low Voltage Field Wiring Connections Condensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistry Inspect/check condensate lines and fittings Check for gas leaks Check thermostat circuits Inspect/fill condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctlyFor Your Safety Read Before Operating Natural Gas Propane Set space heating operationSet Hot Water Generator HW operation Configuration of the cascadeGeneral Operating informationProtection features Cascade Boiler temperature regulationOutdoor reset operation, if used Night Setback operation with cascade Sequence of the cascadeHW operation with cascade Sequence of operation 1Status Screen Sync control moduleOperating information 2Main Menu Screen See the Sync User’s Information Manual for Instructions Maintenance Maintenance and annual startupService technician Owner maintenanceMaintenance Check boiler relief valve Flue vent system and air pipingCheck water system Check expansion tankCheck flame signal Check ignition ground wiringCheck all boiler wiring Check control settingsModel Kit Part Component Number Description Cleaning boiler heat exchangerNiosh stated First Aid Handling ceramic fiber materialsLOW Voltage 120 VAC High Voltage Diagrams2Ladder DiagramPart 3Wiring Diagram Page