Annual Maintenance Checklist
WARNINGS
THE BOILER CONTAINS REFRACTORY CERAMIC FIBER, a possible human carcinogen Use a NIOSH approved respirator when servicing
LABEL ALL WIRES prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation
FAILURE TO MAINTAIN THE BOILER in proper working condition may lead to fire, explosion,
personal injury or death, and extensive property damage.
TURN OFF ALL GAS AND ELECTRIC power supplies to the boiler before servicing. Contact with or release of dangerous flammable gas, electrical voltage, moving parts, and very hot water under pressure may cause serious personal injury, property damage, or death.
LOCK ELECTRICAL BOXES AND GAS VALVES CLOSED to prevent someone from inadvertently restoring power or gas before the heating system is safe to operate.
Equipment you will need:
qSoft bristle brush
qBristle flue brush
qVacuum with brush attachment Perform these tasks each year:
1.Clean low water cutoff probe (if applicable).
2.Inspect vent for obstruction and signs of condensation, distortion, overheating or gas leakage.
3.Clean vent terminal and air intake screens.
4.Inspect boiler flue passages:
(1)Remove vent pipe, damper.
(2)Remove top panel and hood.
(7)Hold burner at throat. Lift front of burner to clear orifice (Figure
6.Perform Startup Checks and Adjustments described earlier in this manual.
7.Check operation of airflow sensing switches.
8.Check for water leaks on the boiler or water pooling around boiler.
9.Manually operate the relief valve. If the water is grey or black, there is excessive oxygen in the system. Oxygen is corrosive to boilers. Eliminate any source of oxygen.
(3) | Remove blocked vent switch and | 10. Verify proper operation after servicing. |
| canopy. |
|
(4) | Examine all flue passageways. Using |
|
| bristle flue brush and vacuum, |
|
| remove any soot or obstructions. |
|
5. Remove and clean main burners: |
| |
(1) | Remove jacket front panel. |
|
(2) | Disconnect pilot tubing at gas valve. |
|
(3) | Disconnect pilot lead wires at gas valve. |
|
(4) | Remove wires from flame |
|
(5) | Remove burner access panel. |
|
(6) | Mark location of the pilot main burner on |
|
| the manifold if the marking on manifold |
|
| is missing or obliterated. |
|
|
| |
|
| 17 |