Burnham ES2 manual Troubleshooting, IQ Boiler Control Status Codes when Err is not displayed

Page 18

Troubleshooting

When a problem occurs with the boiler operation, the Burnham IQ Control System easily provides specific, valuable information to help resolve the issue quickly. The display on the IQ Boiler control should be the first place to check.

If "Err" IS NOT displayed on the IQ Boiler Control: Use the following table to determine the problem and possible causes.

IQ Boiler Control Status Codes (when "Err" is not displayed)

Display

Status

Boiler / Control Action(s)

Blank

Boiler and

No 120 Vac power at boiler, check breaker and wiring between breaker panel and boiler.

Circulator off

 

 

 

Boiler not

Boiler is not seeing Heat Request. Check thermostat or zone wiring for loose connection,

1

responding to

miswiring, or defective thermostat or zone control.

 

Heat Request

 

 

 

 

Check wiring for loose connection, miswiring. When there is a Domestic Hot Water Heat Request

 

Boiler Running

wired to the Outdoor Air Reset card the Circulator will be off for the duration of the priority time.

8

but Circulator

This to allow all of the boiler output to be provided for fast Indirect Water Heater recovery. Check

 

is not Running

Priority Time (pt_) function using Outdoor Air Reset IQ Option Card Adjustment Mode (see Reset

 

 

Card Adjustment Mode instructions).

 

 

The burner failed to light (no flame signal).

10

Retry Delay

After a 5 minute delay, IQ Control will attempt to light the burner again.

 

 

There is no limit to the number of retries.

The burner loses flame during running mode ( code "8").

10

Recycle Delay

After a 10 second delay, IQ Control will attempt to light the burner again.

If the burner loses flame during running mode (

code "8") during the next six recycles, IQ

 

 

 

 

Control will progress to a soft lockout.

 

When a soft lockout occurs, boiler will shut down.

Boiler automatically restarts once condition that caused the lockout is corrected and the one-hour 13 Soft Lockout time delay is completed.

Boiler can be restarted sooner than the time delay by using Adjustment Mode function and manually resetting boiler (see Adjustment Mode instructions).

When a hard lockout occurs boiler shuts down.

14Hard Lockout Boiler will NOT automatically restart once the condition that caused the lockout is corrected. It will be necessary to go to Adjustment Mode function to manually reset the boiler (see

 

 

Adjustment Mode instructions).

 

 

Heat Request occurs and start of operating sequence is halted due to an open limit.

15

Wait for Limit

Open limits may include Flame Roll Out Switch, Blocked Vent Switch, or Auxiliary.

to Close

Limit or Low Water Cutoff IQ Option Cards (when installed), refer to IQ Option Panel display for

 

 

 

additional information.

16

Flame Out of

Flame Signal is still present when expected to be 0 (no flame).

Sequence

 

 

18

Waiting for

Heat Request occurs and the IQ control is waiting for the damper to open (end switch to close).

Damper to Open

 

 

The damper end switch is closed and the control waits for the damper end switch to open (*end

19Waiting for switch is open when damper is closed). This is checked at the beginning of a heat cycle before Damper to Close opening the damper. If the damper doesn't close in 60 seconds, the IQ Control goes to Status 21.

18

Image 18
Contents ES2 Page Whats in the crate? Specifications ES2 SeriesSpecifications Installation Boiler Quick-StartAppendices Unpack the Crate Position the BoilerProvide Combustion Air Connect VentingES2 Vent Connector Horizontal Length Restrictions ft Connect VentingConnect Gas Piping Connect Boiler Water PipingConnect Boiler Water Piping Description Burnham Part NumberConnect Electrical Wiring Operating Mode Options Using IQ Boiler Control DisplayViewing the Operating Mode Options Status Code Displayed in STA ModeUsing the IQ Option Panel Changing the Adjustable ParametersMore Information about Adjustable Parameters Adjustment Mode OptionsUsing the Optional LCD Display Kit Check for Gas and Water LeaksPerform Startup Checks and Adjustments Boiler restartsAnnual Maintenance Checklist Troubleshooting IQ Boiler Control Status Codes when Err is not displayedTroubleshooting IQ Boiler Control Error Codes when Err is flashingIQ Option Panel Display Shows ERR Display Status Boiler / Control ActionsRepair Parts List Repair Parts List Burner Orifices LP Gas 1.20mm IQ Boiler Control Jacket Vestibule Panel Supply Water Manifold Internal Wiring Figure IW-1 Wiring DiagramInternal Wiring Figure IW-2 Wiring SchematicFigure IW-3 Single Zone System with Domestic Hot Water Tank Figure IW-5 Multiple Zone System with Zone Valves Figure IW-7 Multiple Zone System with Zone Valve Panel Appendix a Combustion Air Combined appliance Input BTU/hrAppendix B Venting Figure B-1 Typical Atmospheric Vent Installation This page Intentionally Left Blank Appendix C Gas Piping Length W.c. Pressure Drop FeetAppendix C Gas Piping Appendix D System PipingAppendix D System Piping Hot Water Boilers, Non-CondensingFigure D-0 Piping Schematic Symbols Figure D-W1 Water Boiler, Series Loop Figure D-W3 Water Boiler, Tankless Coil, Two or More Zones Figure D-W5 Water Boiler, Indirect Water Heater Appendix E Filling the System and Checking for Leaks Confirm that the boiler and system have no water leaksAppendix F Adjusting Gas Input Rate Natural Gas BoilersLeak Test Gas Piping Appendix F Adjusting Gas Input RateLP/Propane Gas Boilers Table F-1 Gas Flow Rate in Cu. Ft. / HrAppendix G Checking Draft and Combustion IQ Boiler Control Appendix H iq control systemIQ Control System Overview IQ Option PanelAppendix H IQ Control System IQ Display Kit EnviraCOM ThermostatsFactory Mounted Components Appendix H IQ Control System System Parts ListAdditional Information List Optional ComponentsService Record Limited Warranty