APPENDIX F – Adjusting Gas Input Rate (continued)

Table F-1: Gas Flow Rate in Cu. Ft. / Hr.

Seconds for Two

Size of Gas Meter Dial

One-Half

One

Two

(2) Revolutions

Cu. Ft.

Cu. Ft.

Cu. Ft.

 

24

150.0

300.0

450.0

26

138.4

276.9

415.3

28

128.5

257.1

385.7

30

120.0

240.0

360.0

34

105.8

211.7

317.6

38

94.7

189.4

284.2

42

85.7

171.4

257.1

46

78.2

156.5

234.7

50

72.0

144.0

216.0

55

65.4

130.9

196.3

60

60.0

120.0

180.0

65

55.3

110.7

166.1

70

51.4

102.8

154.2

80

45.0

90.0

135.0

90

40.0

80.0

120.0

100

36.0

72.0

108.0

120

30.0

60.0

90.0

140

25.7

51.4

77.1

160

22.5

47.0

67.5

180

20.0

40.0

60.0

200

18.0

36.0

54.0

(1)Remove Main Burners per procedure in Boiler Service instructions in Section (X).

(2)Remove gas orifices. Drill each orifice

one (1) drill size larger (drill size is stamped on orifice).

(3)Reinstall gas orifices and main burner. Repeat procedure to measure input rate.

15.Recheck Main Burner Flame.

16.Return other gas-fired appliances to previous condition of use.

LP/Propane Gas Boilers:

1.Follow the procedure for gas boilers, except:

2.Adjust tank regulator for gas valve inlet pressure of 13.5 inches w.c. or less, but not less than 11.5 inches w.c.

3.Gas valve has step-opening regulator, which initially opens to 1.4 to 2.5 inches w.c. and steps to full pressure after approximately 30 seconds. Check manifold pressure after step has occurred.

Leak Test Gas Piping:

The boiler and its gas connections must be leak tested and

leak free before placing boiler in operation.

For leak testing over ½ psig, disconnect boiler and its individual shut-

off valve from gas supply piping.

1.For testing at ½ psig or less, isolate boiler from gas supply piping by closing boiler’s individual manual shut-off valve.

2.Check for gas leaks in all piping joints, valves, and fittings using a non-corrosive leak detection solution or an electronic leak detector.

3.Repair any leaks.

45

Image 45
Contents ES2 Page Whats in the crate? ES2 Series SpecificationsSpecifications Installation Boiler Quick-StartAppendices Position the Boiler Unpack the CrateConnect Venting Provide Combustion AirConnect Venting ES2 Vent Connector Horizontal Length Restrictions ftConnect Boiler Water Piping Connect Gas PipingDescription Burnham Part Number Connect Boiler Water Piping Connect Electrical WiringViewing the Operating Mode Options Using IQ Boiler Control DisplayOperating Mode Options Status Code Displayed in STA ModeMore Information about Adjustable Parameters Changing the Adjustable ParametersUsing the IQ Option Panel Adjustment Mode OptionsCheck for Gas and Water Leaks Using the Optional LCD Display KitBoiler restarts Perform Startup Checks and AdjustmentsAnnual Maintenance Checklist IQ Boiler Control Status Codes when Err is not displayed TroubleshootingIQ Boiler Control Error Codes when Err is flashing TroubleshootingDisplay Status Boiler / Control Actions IQ Option Panel Display Shows ERRRepair Parts List Repair Parts List Burner Orifices LP Gas 1.20mm IQ Boiler Control Jacket Vestibule Panel Supply Water Manifold Figure IW-1 Wiring Diagram Internal WiringFigure IW-2 Wiring Schematic Internal WiringFigure IW-3 Single Zone System with Domestic Hot Water Tank Figure IW-5 Multiple Zone System with Zone Valves Figure IW-7 Multiple Zone System with Zone Valve Panel Combined appliance Input BTU/hr Appendix a Combustion AirAppendix B Venting Figure B-1 Typical Atmospheric Vent Installation This page Intentionally Left Blank Length W.c. Pressure Drop Feet Appendix C Gas PipingAppendix D System Piping Appendix C Gas PipingHot Water Boilers, Non-Condensing Appendix D System PipingFigure D-0 Piping Schematic Symbols Figure D-W1 Water Boiler, Series Loop Figure D-W3 Water Boiler, Tankless Coil, Two or More Zones Figure D-W5 Water Boiler, Indirect Water Heater Confirm that the boiler and system have no water leaks Appendix E Filling the System and Checking for LeaksNatural Gas Boilers Appendix F Adjusting Gas Input RateLP/Propane Gas Boilers Appendix F Adjusting Gas Input RateLeak Test Gas Piping Table F-1 Gas Flow Rate in Cu. Ft. / HrAppendix G Checking Draft and Combustion IQ Control System Overview Appendix H iq control systemIQ Boiler Control IQ Option PanelAppendix H IQ Control System EnviraCOM Thermostats IQ Display KitAdditional Information List Appendix H IQ Control System System Parts ListFactory Mounted Components Optional ComponentsService Record Limited Warranty