Boiler Quick-Start 
Installation: | 
  | |
1.  | Unpack the crate  | 7  | 
2.  | Position the boiler  | 7  | 
3.  | Provide combustion air  | 8  | 
4.  | Connect venting  | 8  | 
5.  | Connect gas piping  | 10  | 
6.  | Connect boiler water piping  | 10  | 
7.  | Connect electrical wiring  | 12  | 
8.  | Program the controls  | 13  | 
9.  | Check for gas and water leaks  | 15  | 
10.  | Perform startup checks and adjustments  | 16  | 
Annual Maintenance Checklist  | 17  | |
Troubleshooting  | 18  | |
Repair Parts List  | 21  | |
Internal Wiring  | 27  | |
Appendices: | 
  | |
A – Combustion Air  | 32  | |
B – Venting  | 33  | |
C – Gas Piping  | 36  | |
D – System Piping  | 37  | |
E – Filling the System and Checking for Leaks  | 43  | |
F – Adjusting Gas Input Rate  | 44  | |
G – Checking Draft and Combustion  | 46  | |
H – IQ Control System  | 47  | |
Warranty  | Back Cover  | |