Crown Boiler 24-03, 24-11 Section IV Operating Instructions, Always Inspect Installation Before

Page 47

SECTION IV - OPERATING INSTRUCTIONS

 

 

 

a.

Close isolation valve in boiler supply piping.

 

 

 

 

b.

Isolate all circuits by closing zone valves or

 

WARNING

 

 

 

 

balancing valves.

 

 

 

c.

Attach a hose to bib cock located just below

 

If you do not follow these instructions

 

 

isolation valve in boiler supply piping.

 

exactly, a fire or explosion may result

 

 

 

(Note - Terminate hose in five gallon bucket at a

 

causing property damage or personal

 

 

 

suitable floor drain or outdoor area).

 

injury.

 

 

d. Starting with one circuit, open zone valve.

 

 

 

 

If any unusual or improper operation or

 

e. Open bib cock.

 

site conditions are observed, turn the

 

f.

Open fill valve (Make-up water line should be

 

boiler off and contact an experienced

 

 

located directly above isolation valve in boiler

 

and skilled service agency.

 

 

 

supply piping).

 

 

 

 

 

Follow component manufacturer’s

g. Allow water to overflow from bucket until

 

instructions. Component manufacturer’s

 

discharge from hose is bubble free for 30

 

instructions were provided with the

 

seconds.

 

boiler. Contact component manufacturer

h.

Open zone valve to the second zone to be

 

for replacement if instructions are

 

purged, then close the first. Repeat this step until

 

missing. Do not install, start up, operate,

 

all zones have been purged, but always have one

 

maintain or service this boiler without

 

zone open. At completion, open all zone valves.

 

reading and understanding all of the

i.

Close bib cock, continue filling the system until

 

component instructions. Do not allow

 

 

the pressure gauge registers normal system

 

the boiler to operate with altered,

 

 

 

design operating pressure. Close fill valve.

 

disconnected or jumpered components.

 

 

 

(Note - If make-up water line is equipped

 

Only use replacement components

 

 

 

with pressure reducing valve, system will

 

identical to those originally supplied with

 

 

 

automatically fill to normal system design

 

the boiler and burner.

 

 

 

operating pressure. Leave globe valve open.)

 

 

 

 

A. ALWAYS INSPECT INSTALLATION BEFORE

j.

Open isolation valve in boiler supply piping.

 

STARTING BURNER.

k. Remove hose from bib cock.

B. FILL HEATING SYSTEM WITH WATER.

C. SET CONTROLS with burner service switch turned

 

Boiler must be cleaned and fully free of oil and dirt.

“OFF”.

CAUTION

Failure to clean the system will result in erratic water lines and surging, and other improper system operations.

CLEAN HEATING SYSTEM IF boiler water or condensate return water is dirty or if erratic water lines or surging exist after a few days of boiler operation. Refer to step (K) for proper cleaning instructions for steam and water boilers.

1.STEAM BOILERS - Fill boiler to normal water line. As shown in Figure 1, the normal water line is 41½” from the floor or bottom of casting. At the start of each heating season and once or twice during the season try SAFETY VALVE to be sure it is in working condition. To do this, fasten wire or cord to lever of valve and pull lever — standing safe distance away from valve.

2.HOT WATER BOILERS - Fill entire Heating System with water and vent air from system. Use the following procedure on a Series Loop or Multi- zoned System to remove air from system when filling:

DANGER

Do not operate boiler with pressure above maximum allowable working pressure listed on the Boiler Rating Label.

DO NOT draw water from boiler while in use. When adding water while boiler is in operation, do not open supply valve fully but add water slowly.

1.PRESS RESET BUTTON on primary control and release.

2.On STEAM BOILERS set cut-in pressure on L404A Pressuretrol for three (3) PSI and differential pressure for two (2) PSI. These pressures may be varied to suit individual requirements of installation.

3.On STEAM BOILERS WITH TANKLESS DOMESTIC WATER HEATERS, set boiler water temperature dial on low limit operating control at 190°F (max.). Set differential at 10°.

4.ON WATER BOILERS WITHOUT TANKLESS HEATERS, set high limit dial on L4006A at 210°F. This temperature may be varied to suit requirements

47

Image 47
Contents Series Page Important Information Read Carefully Page Page Table of Contents Table of Contents Section I General Information Boiler RATINGS/DATA Locate the Unit Section I General InformationChimney or Vent Boiler FoundationVents Faults & Suggestions Assembly of Sections Manual DRAW- UP Section II Cast Iron Block AssemblyNipple Gauge Series 24 Section Arrangement Draw-Up Rods Alternating Pattern Manual Draw-up Center Section Channel Block Position Partial Block Draw-Up Hydraulic Draw-Up of Sections Canopy with Rear Flue Outlet Damper Assembly Section III Installation InstructionsBare Boiler Assembly Avoid Breathing Fiber Particulates and Dust Left Side Canopy Intermediate Bracket Inspect ALL Boiler Seals Mount Rear Observation Port Cover Refer to FigureSeries 24 Jacket Assembly Boiler Models 24-03 thru Mount Burner Adapter Plate to Burner Mounting Plate Burner Mounting Plate Refer to Figures 16Purpose of Tappings Steam Boilers Steam Trim Steam Boilers Install Steam Trim This Is Intentionally Left Blank Purpose of Tappings Water Boilers Water Trim Boiler Piping Heating Applications Water Boilers Install Water TrimBurner Installation Page Parallel Piping Conversion Recommendation 1 Use when Recommendation 2 Use when Recommendation 3 Use when Page Page Page BMounting Elevations M&M 150, 64 Float Low Water Cut-offs Schematic Tankless Heater Piping 24-08 24-09 CCW Open to System Return Temperature Control and ComponentsWater Boiler Pressure Relief Valve Hook-Up Typical Boiler Wiring with RTC Front Typical Boiler with RTC Return Sensor Rear Fill Heating System with Water Always Inspect Installation BeforeSection IV Operating Instructions Starting BurnerFlame Failure Boil MIN Delay Check Operation of High Limit Control Test ControlsBoiler and System Cleaning Steam Boiler Boiler and System Cleaning Water Boilers Oxygen Corrosion Frequent Water AdditionClean the Boiler Flueways Section V Service InstructionsMaintenance of LOW Water Cutoff Devices Operation General Maintenance ConsiderationsOIL Burners Section VI Burner SpecificationsSection VII Repair Parts & Carton Contents Series 24 Master Parts List Section VII Repair Parts Jacket Carton Bare Boiler Assembly Section Joiner Carton Assy Rear Target Wall Carton Standard Steam Trim Carton Assy RTC Carton with Outdoor Reset Tankless Coil Components Boiler Water Section Viii Appendix Page Mechanical Page Mechanical Electrical Page Page Page Page Page Page Page Page Series 24 Boiler Circulator Selection Taco 20F Differential Boiler Recirculation Grundfos Circulating Pump Way Boiler Recirculation Bell and Gossett Circulating Pump Way Boiler Recirculation Armstrong Circulating Pump Way Application Appendix C Valve and Actuator Mounting InstructionsService Record PN 980417 S24 12/05