Crown Boiler 24-05, 24-11, 24-10, 24-08, 24-12, 24-06, 24-09, 24-03 Standard Steam Trim Carton Assy

Page 65

STANDARD STEAM TRIM CARTON ASSY.

DESCRIPTION

CROWN

QUANTITY

PART #

 

 

LWCO, #67

400682

1

GLASS SET (11.25" CTR TO CTR)

950082

1

L404F1367

3503800

1

1/2 X 3 BR NIPPLES

95-116

2

1/2" BR. UNION

95-150

2

1/2 X CL BRASS NIPPLE

95-147

2

3/4 BLACK EXTENSION

95-090

1

3/4 X 1/4 BRASS BUSHING

950016

1

90 DEG. BRASS PIGTAIL

95-060B

1

PRESSURE GAUGE

95-070

1

1/2 X 1/4 BRASS BUSHING

95-146

1

3/4" RECESSED HEAD PLUG

950265

3

1" NPT RECESSED HEAD PLUG

950270

4

3" SQ. HD PLUG

950273

2

3 X 1 1/4 BLK BUSHING

950275

1

1-1/2 X 4 BLK NIPPLE

950124

1

1-1/2 BLK TEE

950180

1

1-1/2 BLK SQ. HD PLUG

95-143

1

STANDARD WATER TRIM CARTON ASSY.

DESCRIPTION

CROWN

QUANTITY

PART #

 

 

L4006A2015

35-3510

1

3/4 LONG WELL

35-1020

1

TRIDICATOR GAUGE

95-038

1

1/2 X 1/4 BLK BUSHING

95-053

1

3 X 3/4 BLK BUSHING

950035

1

1/2" NPT RECESSED HEAD PLUG

950260

2

3/4" NPT RECESSED HEAD PLUG

950265

3

1" NPT RECESSED HEAD PLUG

950270

4

3" PLUG

950273

2

4" PLUG

950274

1

65

Image 65
Contents Series Page Important Information Read Carefully Page Page Table of Contents Table of Contents Section I General Information Boiler RATINGS/DATA Locate the Unit Section I General InformationChimney or Vent Boiler FoundationVents Faults & Suggestions Assembly of Sections Manual DRAW- UP Section II Cast Iron Block AssemblyNipple Gauge Series 24 Section Arrangement Draw-Up Rods Alternating Pattern Manual Draw-up Center Section Channel Block Position Partial Block Draw-Up Hydraulic Draw-Up of Sections Canopy with Rear Flue Outlet Damper Assembly Section III Installation InstructionsBare Boiler Assembly Avoid Breathing Fiber Particulates and Dust Left Side Canopy Intermediate Bracket Inspect ALL Boiler Seals Mount Rear Observation Port Cover Refer to FigureSeries 24 Jacket Assembly Boiler Models 24-03 thru Mount Burner Adapter Plate to Burner Mounting Plate Burner Mounting Plate Refer to Figures 16Purpose of Tappings Steam Boilers Steam Trim Steam Boilers Install Steam Trim This Is Intentionally Left Blank Purpose of Tappings Water Boilers Water Trim Boiler Piping Heating Applications Water Boilers Install Water TrimBurner Installation Page Parallel Piping Conversion Recommendation 1 Use when Recommendation 2 Use when Recommendation 3 Use when Page Page Page BMounting Elevations M&M 150, 64 Float Low Water Cut-offs Schematic Tankless Heater Piping 24-08 24-09 CCW Open to System Return Temperature Control and ComponentsWater Boiler Pressure Relief Valve Hook-Up Typical Boiler Wiring with RTC Front Typical Boiler with RTC Return Sensor Rear Section IV Operating Instructions Always Inspect Installation BeforeStarting Burner Fill Heating System with WaterFlame Failure Boil MIN Delay Check Operation of High Limit Control Test ControlsBoiler and System Cleaning Steam Boiler Boiler and System Cleaning Water Boilers Oxygen Corrosion Frequent Water AdditionClean the Boiler Flueways Section V Service InstructionsMaintenance of LOW Water Cutoff Devices Operation General Maintenance ConsiderationsOIL Burners Section VI Burner SpecificationsSection VII Repair Parts & Carton Contents Series 24 Master Parts List Section VII Repair Parts Jacket Carton Bare Boiler Assembly Section Joiner Carton Assy Rear Target Wall Carton Standard Steam Trim Carton Assy RTC Carton with Outdoor Reset Tankless Coil Components Boiler Water Section Viii Appendix Page Mechanical Page Mechanical Electrical Page Page Page Page Page Page Page Page Series 24 Boiler Circulator Selection Taco 20F Differential Boiler Recirculation Grundfos Circulating Pump Way Boiler Recirculation Bell and Gossett Circulating Pump Way Boiler Recirculation Armstrong Circulating Pump Way Application Appendix C Valve and Actuator Mounting InstructionsService Record PN 980417 S24 12/05