Crown Boiler 24-03, 24-11, 24-10, 24-08, 24-12, 24-06, 24-05, 24-09, 24-04, 24-07 Steam Trim

Page 27

Figure 25b: Steam Trim

KEY

DESCRIPTION

BOILER MODELS

1

1/2" X 3" BR NIPPLE

ALL

2

1/2" BR UNION

ALL

3

1/2" BR CLOSE NIPPLE

ALL

4

LWCO, #67

ALL

5

GAUGE GLASS SET

ALL

6

3" SQ. HD. PLUG

ALL

7

3/4" X 2" NIPPLE

ALL

8

3/4" UNION

ALL

9

3/4" X 1/4" HEX BUSHING

ALL

10

1/4" 90° BR PIGTAIL

ALL

11

L404C1147

CSD-1 EQUIPPED BOILERS

12

1/2" X 1/4" BR BUSHING

ALL

13

PRESSURE GAUGE

ALL

14

3/4" RECESSED HD PLUG

ALL

15

3/4" BLK EXTENSION

ALL

16

L404F1367

ALL

17

FIRING RATE PRES CTRL

MODULATING BOILERS

18

1" X 5-1/2" NIPPLE

CSD-1 EQUIPPED BOILERS

PUMPED RETURN

 

 

19

1" UNION

CSD-1 EQUIPPED BOILERS

PUMPED RETURN

 

 

20

1" X 3-1/2" NIPPLE

CSD-1 EQUIPPED BOILERS

PUMPED RETURN

 

 

21

1" CLOSE NIPPLE

CSD-1 EQUIPPED BOILERS

PUMPED RETURN

 

 

22

1" BALL VALVE

CSD-1 EQUIPPED BOILERS

PUMPED RETURN

 

 

23

1" RECESSED HD PLUG

CSD-1 EQUIPPED BOILERS

PUMPED RETURN

 

 

24

1" CROSS

CSD-1 EQUIPPED BOILERS

PUMPED RETURN

 

 

25

1" NIPPLE*

CSD-1 EQUIPPED BOILERS

PUMPED RETURN

 

 

26

#150-MD LWCO

CSD-1 EQUIPPED BOILERS

PUMPED RETURN

 

 

26

#64 LWCO

CSD-1 EQUIPPED BOILERS

GRAVITY RETURN

 

 

27

1" NIPPLE**

CSD-1 EQUIPPED BOILERS

PUMPED RETURN

 

 

28

1" NIPPLE***

CSD-1 EQUIPPED BOILERS

PUMPED RETURN

 

 

*SIZE NIPPLE TO SET WATER LEVEL OF LWCO.

**SIZE NIPPLE TO MAKE UP LENGTH BETWEEN 24 & 26.

***SIZE NIPPLE TO MAKE UP LENGTH BETWEEN 19 & 24.

STANDARD

QUANTITY

 

 

 

STANDARD

QUANTITY

OPTIONAL

NOT SUPPLIED

KEY

DESCRIPTION

BOILER MODELS

OPTIONAL

NOT SUPPLIED

 

 

 

 

 

 

2

 

 

29

1" X 12" NIPPLE

CSD-1 EQUIPPED BOILERS

 

 

1

 

 

PUMPED RETURN

 

 

 

 

 

 

 

 

 

 

2

 

 

30

4" BK PLUG

ALL

1

 

 

2

 

 

31

1-1/2" X 4 NIPPLE

ALL

1

 

 

2

 

 

32

1-1/2" TEE

ALL

1

 

 

2

 

 

33

1-1/2" SQ. HD. PLUG

ALL

1

 

 

2

 

 

34

1-1/2" x 3/4" BLK BUSHING

24-03

1

 

 

 

 

1

34

1-1/2" x 1" BLK BUSHING

24-04

1

 

 

 

 

1

34

1-1/2" x 1-1/4" BLK BUSHING

24-05 THRU 24-08

1

 

 

1

1

1

35

3/4" CLOSE NIPPLE

24-03

 

 

1

1

1

1

35

1" CLOSE NIPPLE

24-04

 

 

1

 

1

 

35

1-1/4" CLOSE NIPPLE

24-05 THRU 24-08

 

 

1

1

 

 

35

1-1/2" CLOSE NIPPLE

24-09 THRU 24-12

 

 

1

1

 

 

36

SAFETY VALVE 13-211

24-03

1

 

 

1

 

 

36

SAFETY VALVE 13-202

24-04

1

 

 

1

1

 

36

SAFETY VALVE 13-213

24-05 THRU 24-08

1

 

 

1

 

 

36

SAFETY VALVE 13-214

24-09 THRU 24-12

1

 

 

 

 

1

37

3" X 1-1/4" BLK BUSHING

ALL

1

 

 

 

 

1

38

1-1/4" X 3/4" BUSHING

24-03 THRU 24-04

1

 

 

 

 

2

38

1-1/4" X 1" BUSHING

24-05 THRU 24-08

1

 

 

 

 

2

39

3/4" CLOSE NIPPLE

24-03 THRU 24-04

 

 

1

 

 

1

39

1" CLOSE NIPPLE

24-05 THRU 24-08

 

 

1

 

 

1

39

1-1/4" CLOSE NIPPLE

24-09 THRU 24-12

 

 

1

4

 

3

40

3/4" BALL VALVE

24-03 THRU 24-04

 

 

1

 

 

3

40

1" BALL VALVE

24-05 THRU 24-08

 

 

1

 

 

1

40

1-1/4" BALL VALVE

24-09 THRU 24-12

 

 

1

 

1

 

41

3/4" SQ. HD. PLUG

24-03 THRU 24-04

 

 

1

 

1

 

41

1" SQ. HD. PLUG

24-05 THRU 24-08

 

 

1

 

 

1

41

1-1/4" SQ. HD. PLUG

24-09 THRU 24-12

 

 

1

 

 

1

 

 

 

 

 

 

27

Image 27
Contents Series Page Important Information Read Carefully Page Page Table of Contents Table of Contents Section I General Information Boiler RATINGS/DATA Locate the Unit Section I General InformationChimney or Vent Boiler FoundationVents Faults & Suggestions Assembly of Sections Manual DRAW- UP Section II Cast Iron Block AssemblyNipple Gauge Series 24 Section Arrangement Draw-Up Rods Alternating Pattern Manual Draw-up Center Section Channel Block Position Partial Block Draw-Up Hydraulic Draw-Up of Sections Canopy with Rear Flue Outlet Damper Assembly Section III Installation InstructionsBare Boiler Assembly Avoid Breathing Fiber Particulates and Dust Left Side Canopy Intermediate Bracket Inspect ALL Boiler Seals Mount Rear Observation Port Cover Refer to FigureSeries 24 Jacket Assembly Boiler Models 24-03 thru Mount Burner Adapter Plate to Burner Mounting Plate Burner Mounting Plate Refer to Figures 16Purpose of Tappings Steam Boilers Steam Trim Steam Boilers Install Steam Trim This Is Intentionally Left Blank Purpose of Tappings Water Boilers Water Trim Water Boilers Install Water Trim Burner InstallationBoiler Piping Heating Applications Page Parallel Piping Conversion Recommendation 1 Use when Recommendation 2 Use when Recommendation 3 Use when Page Page Page BMounting Elevations M&M 150, 64 Float Low Water Cut-offs Schematic Tankless Heater Piping 24-08 24-09 CCW Open to System Return Temperature Control and ComponentsWater Boiler Pressure Relief Valve Hook-Up Typical Boiler Wiring with RTC Front Typical Boiler with RTC Return Sensor Rear Fill Heating System with Water Always Inspect Installation BeforeSection IV Operating Instructions Starting BurnerFlame Failure Boil MIN Delay Check Operation of High Limit Control Test ControlsBoiler and System Cleaning Steam Boiler Boiler and System Cleaning Water Boilers Oxygen Corrosion Frequent Water AdditionClean the Boiler Flueways Section V Service InstructionsMaintenance of LOW Water Cutoff Devices Operation General Maintenance ConsiderationsOIL Burners Section VI Burner SpecificationsSection VII Repair Parts & Carton Contents Series 24 Master Parts List Section VII Repair Parts Jacket Carton Bare Boiler Assembly Section Joiner Carton Assy Rear Target Wall Carton Standard Steam Trim Carton Assy RTC Carton with Outdoor Reset Tankless Coil Components Boiler Water Section Viii Appendix Page Mechanical Page Mechanical Electrical Page Page Page Page Page Page Page Page Series 24 Boiler Circulator Selection Taco 20F Differential Boiler Recirculation Grundfos Circulating Pump Way Boiler Recirculation Bell and Gossett Circulating Pump Way Boiler Recirculation Armstrong Circulating Pump Way Application Appendix C Valve and Actuator Mounting InstructionsService Record PN 980417 S24 12/05