SECTION II - CAST IRON BLOCK ASSEMBLY
CAUTION
Boiler sections must be
A.FIELD ASSEMBLED SECTIONS — If the boiler was ordered to be field assembled, follow the assembly procedure outlined on the following pages.
1.ASSEMBLY OF SECTIONS (MANUAL DRAW- UP)
These sections are designed to be drawn together, one section at a time, using the 9¾” long
Tools required:
(1)¾” Drive Ratchet
(1)
(1)
(1)Container of grease, oil or other appropriate lubricant.
CAUTION
When assembling sections without hydraulic
a.Place the rear section in its approximate final position, as outlined in Section I, and support it with a suitable prop and wedges. See Figure 5.
b.On size
c.Clean the groove in the ground joint along the edge of the section with the wire brush.
d.Open the Boiler Assembly Carton(s) and remove the bottle of adhesive. Using the dauber supplied in the bottle, apply the adhesive to the groove.
Be sure to use enough adhesive to sufficiently coat the entire groove surface. If so desired, a
ENSURE THAT THE ADHESIVE DOES NOT COME IN CONTACT WITH THE NIPPLES OR NIPPLE PORTS.
e.Clean nipples and nipple ports thoroughly with a
f.Drive nipples squarely into section using block of wood and hammer, or preferably, an aluminum head hammer. (Crown offers a Polyethylene Block for setting the nipples, part number 330010). Place block over entire nipple edge and hit the wood with the hammer.
Figure 5: Positioning of Back Section