Crown Boiler 24-12 Mount Rear Observation Port Cover Refer to Figure, Inspect ALL Boiler Seals

Page 23

C.MOUNT REAR OBSERVATION PORT COVER Refer to Figure 16.

1.With the silastic sealant, secure the 3/16” diameter rope gasket into the groove around the perimeter of the rear observation port cover.

2.Mount the rear observation port cover onto the rear section (with the word “Top” in the upright position) using the four (4) 5/16” - 18 x 1” lg. cap screws and flat washers provided.

D. INSPECT ALL BOILER SEALS

1.A visual inspection should be made of all sealed joints and repairs made as necessary. Darken the boiler room and place a light source in the combustion space and canopy to observe any gaps or open seals. Poor seals must be repaired and rechecked before continuing.

E. JACKET ASSEMBLY - See Figure 22 for Jacket Assembly Details.

1.Open jacket carton and jacket hardware package. Unless otherwise stated, all jacket components are fastened with #8 x ½” hex head sheet metal screws. Do not drive sheet metal screws tight until jacket assembly is complete.

2.On boilers with rear flue outlet damper assembly, remove square knockout from jacket rear panel. To remove knockout, use a single hacksaw blade with handle or aviation snips to cut metal tabs between slotted holes.

3.Attach jacket front panel to front section and jacket rear panel to back section using the eight (8) #10 x ½” self tapping screws. Tighten these screws securely.

4.Attach jacket lower tie bar panel (approximately

5-5/8” high) to the bottom of the jacket front and rear panels using four (4) sheet metal screws. Repeat for opposite side.

5.Attach jacket upper tie bar panel (approximately

4-1/8” high) to the top of the jacket front and rear panels using four (4) sheet metal screws. Repeat for opposite side.

JACKET LEFT SIDE PANEL USAGE CHART

BOILER

 

 

MULTIPLE LEFT SIDE PANELS*

 

 

MODEL

 

PANEL 1

PANEL 2

PANEL 3

PANEL 4

PANEL 5

 

 

 

 

 

 

 

 

 

24-03

 

L10

L5

-

-

-

 

24-04

 

L10

L11

-

-

-

 

24-05

REAR OF BOILER

L10

L17

-

-

-

FRONT OF BOILER

24-06

L10

L18

L5

-

-

24-07

L10

L18

L11

-

-

24-08

L10

L18

L17

-

-

24-09

L10

L18

L18

L5

-

24-10

L10

L18

L18

L11

-

24-11

 

L10

L18

L18

L17

-

 

24-12

 

L10

L18

L18

L18

L5

 

6.Jacket Top Panel Attachment

a.On boilers with top flue outlet damper assembly, remove octagon shaped knockout. To remove knockout, use a single hacksaw blade with handle or aviation snips to cut metal tabs between slotted holes.

b.Remove knockout(s) for necessary supply piping in a similar manner.

c.Attach jacket top panel to the front panel, rear panel and upper tie bar panels with sheet metal screws.

7.Install Jacket side Panels

a.Snap black thumb hole bushings into all side panel holes.

b.Use the left side panel and right side panel usage charts to determine correct positions of side panels. The three (3) digit panel identification numbers shown in the charts are also stamped along the bottom edge of each panel. Refer to Figures 20 and 21.

c.Rearward and Intermediate panels have reverse bend flanges on one side of panel. These panels must be installed prior to forward panels.

NOTICE

To install multiple side panels, start at the rear of boiler and work forward. To remove panels, reverse order of assembly.

d.If boiler is equipped with tankless heaters they should be installed at this time if they were not installed for hydrostatic test outlined on Page 18.

e.Install right side panels into position by inserting top of panel into ‘U’ shaped channel, pushing bottom of panel in toward boiler, and sliding panel down into ‘J’ shaped channel. Repeat procedure until all right side panels are in place.

f.Remove the knockouts necessary for tankless heater operation on left side panels.

g.Install left side panels, using the same procedure used to install the right side panels.

RIGHT SIDE PANEL USAGE CHART

BOILER

 

SINGLE / MULTIPLE RIGHT SIDE PANELS*

 

MODEL

 

PANEL 3

PANEL 2

PANEL 1

 

 

 

 

 

 

 

24-03

 

-

-

R15 (SINGLE)

 

24-04

 

-

-

R21 (SINGLE)

 

24-05

OFFRONTBOILER

-

-

R27 (SINGLE)

OFREARBOILER

24-10

-

R27

R30

24-06

 

-

-

R33 (SINGLE)

 

24-07

 

-

R15

R24

 

24-08

 

-

R21

R24

 

24-09

 

-

R27

R24

 

 

 

 

 

 

 

24-11

 

-

R33

R30

 

24-12

 

R21

R24

R24

 

*NOTE: TO INSTALL MULTIPLE SIDE PANELS, START AT THE REAR AND WORK FORWARD. TO REMOVE PANELS, REVERSE ORDER OF ASSEMBLY.

Figure 20: Left Side Panel Usage Chart

Figure 21: Right Side Panel Usage Chart

23

Image 23
Contents Series Page Important Information Read Carefully Page Page Table of Contents Table of Contents Section I General Information Boiler RATINGS/DATA Locate the Unit Section I General InformationChimney or Vent Boiler FoundationVents Faults & Suggestions Assembly of Sections Manual DRAW- UP Section II Cast Iron Block AssemblyNipple Gauge Series 24 Section Arrangement Draw-Up Rods Alternating Pattern Manual Draw-up Center Section Channel Block Position Partial Block Draw-Up Hydraulic Draw-Up of Sections Canopy with Rear Flue Outlet Damper Assembly Section III Installation InstructionsBare Boiler Assembly Avoid Breathing Fiber Particulates and Dust Left Side Canopy Intermediate Bracket Inspect ALL Boiler Seals Mount Rear Observation Port Cover Refer to FigureSeries 24 Jacket Assembly Boiler Models 24-03 thru Mount Burner Adapter Plate to Burner Mounting Plate Burner Mounting Plate Refer to Figures 16Purpose of Tappings Steam Boilers Steam Trim Steam Boilers Install Steam Trim This Is Intentionally Left Blank Purpose of Tappings Water Boilers Water Trim Boiler Piping Heating Applications Water Boilers Install Water TrimBurner Installation Page Parallel Piping Conversion Recommendation 1 Use when Recommendation 2 Use when Recommendation 3 Use when Page Page Page BMounting Elevations M&M 150, 64 Float Low Water Cut-offs Schematic Tankless Heater Piping 24-08 24-09 CCW Open to System Return Temperature Control and ComponentsWater Boiler Pressure Relief Valve Hook-Up Typical Boiler Wiring with RTC Front Typical Boiler with RTC Return Sensor Rear Fill Heating System with Water Always Inspect Installation BeforeSection IV Operating Instructions Starting BurnerFlame Failure Boil MIN Delay Check Operation of High Limit Control Test ControlsBoiler and System Cleaning Steam Boiler Boiler and System Cleaning Water Boilers Oxygen Corrosion Frequent Water AdditionClean the Boiler Flueways Section V Service InstructionsMaintenance of LOW Water Cutoff Devices Operation General Maintenance ConsiderationsOIL Burners Section VI Burner SpecificationsSection VII Repair Parts & Carton Contents Series 24 Master Parts List Section VII Repair Parts Jacket Carton Bare Boiler Assembly Section Joiner Carton Assy Rear Target Wall Carton Standard Steam Trim Carton Assy RTC Carton with Outdoor Reset Tankless Coil Components Boiler Water Section Viii Appendix Page Mechanical Page Mechanical Electrical Page Page Page Page Page Page Page Page Series 24 Boiler Circulator Selection Taco 20F Differential Boiler Recirculation Grundfos Circulating Pump Way Boiler Recirculation Bell and Gossett Circulating Pump Way Boiler Recirculation Armstrong Circulating Pump Way Application Appendix C Valve and Actuator Mounting InstructionsService Record PN 980417 S24 12/05