5.0 Dimensions and Fixings

At least

1.5°

A

B

DIMENSIONS

A850mm

B520mm

C390mm

D125mm Ø Min.

E175mm

F150mm

D

Fig. 7

E

C

Flue Ø 110mm

F

The 1.5° fall provided by the elbow is to allow condensate to run back to the boiler, for discharge through the condensate disposal system.

SIDE FLUE (left and right)

Y

X

At least

1.5°

Fig. 8

For every 1m of horizontal flue length, the clearance above the top of the flue elbow should be 27.5mm to incorporate the 1.5° fall in the flue from the terminal to the elbow. It is especially important to consider this when fitting the boiler under a work top !

Flue length (Y)

Clearance (X)

up to 1m

27.5mm

1m - 2m

55mm

2m - 3m

82.5mm

3m - 4m

110mm

 

 

10© Baxi Heating UK Ltd 2011

Image 10 Contents
FSB 30 HE Natural Gas Potterton Gold FSB 30 HE No 592Installer Notification Guidelines Scheme Members onlyLegislation Important Installation, Commissioning, Service & RepairGas Safety Installation & Use Regulations Codes of Practice, most recent version should be usedContents Description IntroductionImportant Information General Layout Flow Temperature Thermistor RedPosition of Optional Integral Timer Wiring Layout Figs , 4, 5Boiler Operation Boiler OperationAll TRVs Shut Down ? Minute Anti-cycle CAT I 2H Technical DataIpxx Dimensions and Fixings Water Circulating Systems System DetailsTreatment of Water Circulating Systems Pipework Low Head InstallationAir Vents System Controls & Wiring Sealed Systems Fig Location Site RequirementsCompartment Electrical Supply Clearances Figs &16Gas Supply 5mm Min 500mm Min For Servicing Purposes 390mmCondensate Drain General Condensate Disposal± 10 from vertical Site RequirementSink Blockage or restriction of the pipe into the drainFlue MINHorizontal Flue Systems Flue OptionsHorizontal Flue System Examples This bend is equivalent to 0.5 metreTotal equivalent length Vertical Flue System Examples Twin PipeTwin & Vertical Flue Systems 17.2 + 34.4 = 51.6 metresFlue Group B Flue AccessoriesCDS Flue Group PFor Twin Flue Systems For Vertical Flues For Vertical Flue SystemsFor Twin Flues Terminal Guard Fig Flue DimensionsFor Roof Terminals Flue Deflector aPlume Displacement Plume Displacement Kit P.D.KDetermining Permissible Lengths P.D.K Min metres Min .3 metres General Fitting Notes P.D.KThis section of the flue Must be horizontal Fig. H Installation Fitting the Standard Flue Flue Inner Flue Support BracketInner Flue Support Bracket Flue Elbow Gasket Flue Trim PointsMaking the Condensate Drain ConnectionCable Clamp Way Terminal Block Making The Electrical ConnectionsIntegral Programmer Green/Yellow Schematic Wiring DiagramElectrical Fuse 3.15 ATIllustrated Wiring Diagram PCBCommissioning the Boiler Commissioning the BoilerPriming the Condensate Pump Check the Operational Working Gas Inlet Pressure Fitting The Case Panels & Facia 13.2 ‘Benchmark’ ChecklistCompletion HandoverServicing the Boiler Annual ServicingEarth Combustion Box Door Panel Annual Servicing InspectionAir Box Door Panel Spark Sleeve InsulationLock Nut Service Drain Plug Central Insulation Panel Pipe may be removed to increase accessCracks/damage. Clean with a soft brush To it FigChanging Components Flow Temperature Thermistor and Safety Thermostat FigChanging Components & Preparation Drain the boiler see .1 paragraph 2 Condensate Pump Complete aClip Check operation of the pump See SectionChanging Components Spark and Sensing Electrodes Fig Condensate Trap Fig Injector Pipe FigGas Valve Fig Securing Nut Sensor Leads Condensate Trap Lock NutHeat Exchanger Heat Exchanger Manifold AssemblyCombustion Box Door Panel Burner Support Bracket Burner Securing Screws Short Parts List Short Parts ListKey Description Fault Finding 240V at C ? 240V at a ?240V at B ? 240V at D ?System full of water ? Wires from inline Connector to PCB faultyViewed from Wire Entry end Replace Flow Switch Pump running ?Replace PCB Way Connector Lead from PCB to Gas Valve faulty Wiring from PCBRectify wiring Is there Gas at gas valve inlet ?Lights On Off Replace Stat Replace fan Lights Rectify wiring Viewed from Wire Entry end ‘A’ ‘C’ ‘D’ ‘B’YES Condensing Boilers only Service Record Potterton Brooks House, Coventry Road, Warwick. CV34 4LL Comp No 6/11