Baxi Potterton Gold FSB 30 HE manual Annual Servicing Inspection, Air Box Door Panel Spark Sleeve

Page 40

Air Box Door Panel

Spark

 

Sleeve

Sensing

 

 

Lead Terminals

Earth

Fig. 40

Combustion Box

Door Panel

40© Baxi Heating UK Ltd 2011

Fig. 39

Fig. 41

14.0Servicing the Boiler

14.2Annual Servicing - Inspection

WARNING: The PCB Control and Fan Assembly are 325 Vdc. Isolate system controls before access

1.Ensure that the boiler is cool.

2.Remove the facia and front door panel.

3.Release the four 1/4 turn screws securing the air box door panel and remove the panel (Fig. 39).

4.Disconnect the three leads from the terminals (Fig. 40).

5.Undo the four screws securing the combustion box door and remove the door (Fig. 41).

6.Visually check for debris/damage and clean or replace if necessary the following:

a)Burner.

b)Heat exchanger fins.

c)Fan compartment (Check also for condensate leaks).

d)Insulation.

e)Door seals-Important: Pay particular attention to the condition of the combustion box door seals.

f)Electrodes.

g)The condensate trap.

h)The condensate pump

i)Top of heat exchanger.

Image 40 Contents
FSB 30 HE Natural Gas Potterton Gold FSB 30 HE No 592Installer Notification Guidelines Scheme Members onlyImportant Installation, Commissioning, Service & Repair Gas Safety Installation & Use RegulationsLegislation Codes of Practice, most recent version should be usedContents Description IntroductionImportant Information Flow Temperature Thermistor Red Position of Optional Integral Timer WiringGeneral Layout Layout Figs , 4, 5Boiler Operation Boiler OperationAll TRVs Shut Down ? Minute Anti-cycle CAT I 2H Technical DataIpxx Dimensions and Fixings Water Circulating Systems System DetailsTreatment of Water Circulating Systems Pipework Low Head InstallationAir Vents System Controls & Wiring Sealed Systems Fig Location Site RequirementsCompartment Clearances Figs &16 Gas SupplyElectrical Supply 5mm Min 500mm Min For Servicing Purposes 390mmCondensate Drain General Condensate DisposalSite Requirement Sink± 10 from vertical Blockage or restriction of the pipe into the drainFlue MINFlue Options Horizontal Flue System ExamplesHorizontal Flue Systems This bend is equivalent to 0.5 metreVertical Flue System Examples Twin Pipe Twin & Vertical Flue SystemsTotal equivalent length 17.2 + 34.4 = 51.6 metresFlue Accessories CDSFlue Group B Flue Group PFor Twin Flue Systems For Vertical Flues For Vertical Flue SystemsFor Twin Flues Flue Dimensions For Roof TerminalsTerminal Guard Fig Flue Deflector aPlume Displacement Plume Displacement Kit P.D.KDetermining Permissible Lengths P.D.K Min metres Min .3 metres General Fitting Notes P.D.KThis section of the flue Must be horizontal Fig. H Installation Fitting the Standard Flue Flue Inner Flue Support BracketInner Flue Support Bracket Flue Elbow Gasket Flue Trim PointsMaking the Condensate Drain ConnectionCable Clamp Way Terminal Block Making The Electrical ConnectionsIntegral Programmer Schematic Wiring Diagram ElectricalGreen/Yellow Fuse 3.15 ATIllustrated Wiring Diagram PCBCommissioning the Boiler Commissioning the BoilerPriming the Condensate Pump Check the Operational Working Gas Inlet Pressure 13.2 ‘Benchmark’ Checklist CompletionFitting The Case Panels & Facia HandoverServicing the Boiler Annual ServicingAnnual Servicing Inspection Air Box Door Panel Spark SleeveEarth Combustion Box Door Panel InsulationPipe may be removed to increase access Cracks/damage. Clean with a soft brushLock Nut Service Drain Plug Central Insulation Panel To it FigChanging Components Flow Temperature Thermistor and Safety Thermostat FigChanging Components & Preparation Condensate Pump Complete a ClipDrain the boiler see .1 paragraph 2 Check operation of the pump See SectionChanging Components Spark and Sensing Electrodes Fig Injector Pipe Fig Gas Valve FigCondensate Trap Fig Securing Nut Sensor Leads Condensate Trap Lock NutHeat Exchanger Heat Exchanger Manifold AssemblyCombustion Box Door Panel Burner Support Bracket Burner Securing Screws Short Parts List Short Parts ListKey Description Fault Finding 240V at a ? 240V at B ?240V at C ? 240V at D ?Wires from inline Connector to PCB faulty Viewed from Wire Entry end Replace Flow SwitchSystem full of water ? Pump running ?Wiring from PCB Rectify wiringReplace PCB Way Connector Lead from PCB to Gas Valve faulty Is there Gas at gas valve inlet ?Lights On Off Replace Stat Replace fan Lights Rectify wiring Viewed from Wire Entry end ‘A’ ‘C’ ‘D’ ‘B’YES Condensing Boilers only Service Record Potterton Brooks House, Coventry Road, Warwick. CV34 4LL Comp No 6/11