Baxi Potterton Gold FSB 30 HE manual Flue Accessories, Cds, Flue Group P, Flue Group B,P

Page 22

A

A1

B

 

E

TK

CDS

G

F

U,W

M

L

N

J

22© Baxi Heating UK Ltd 2011

8.0Flue Options

8.3Flue Accessories

Key

Accessory

Size

Code No

FLUE GROUP B

 

 

 

Concentric Flue System 110mm diameter

 

 

A1

Horizontal Flue Terminal

850mm

243013BAX

A

Horizontal Flue Terminal (incl elbow)

236921

 

B

Flue Extension

1000mm

241695

 

 

 

500mm

241694

 

 

 

250mm

241692

 

C

Flue Bend

93°

241687

 

D

Flue Bend (pair)

135°

241689

 

U

Pipe Support

110mm

243014BAX

T

Vertical Flue Boiler Adaptor

 

5106888

 

S

Flue Terminal Deflector

 

248167

 

FLUE GROUP P

 

 

 

Twin Flue System 80mm diameter

 

 

 

E

Flue Extension (pair)

1000mm

246137

 

 

 

500mm

246136

 

 

 

250mm

246135

 

F

Flue Bend (pair)

90°

5121560

 

G

Flue Bend (2 pair)

135°

5121561

 

J

Vertical Flue Boiler Adaptor Kit

 

242757

 

W

Pipe Support (pair)

80mm

5111081

 

FLUE GROUP B,P

 

 

 

Vertical Flue Kits

 

 

 

K

Vertical Flue Terminal

 

242802

 

L

Pitched Roof Flashing

25°/50°

243015

 

M

Roof Cover Plate

 

243131

 

N

Flat Roof Flashing

 

243016BAX

 

 

 

 

 

Image 22 Contents
FSB 30 HE Natural Gas Potterton Gold FSB 30 HE No 592Installer Notification Guidelines Scheme Members onlyLegislation Important Installation, Commissioning, Service & RepairGas Safety Installation & Use Regulations Codes of Practice, most recent version should be usedContents Description IntroductionImportant Information General Layout Flow Temperature Thermistor RedPosition of Optional Integral Timer Wiring Layout Figs , 4, 5Boiler Operation Boiler OperationAll TRVs Shut Down ? Minute Anti-cycle CAT I 2H Technical DataIpxx Dimensions and Fixings Water Circulating Systems System DetailsTreatment of Water Circulating Systems Pipework Low Head InstallationAir Vents System Controls & Wiring Sealed Systems Fig Location Site RequirementsCompartment Electrical Supply Clearances Figs &16Gas Supply 5mm Min 500mm Min For Servicing Purposes 390mmCondensate Drain General Condensate Disposal± 10 from vertical Site RequirementSink Blockage or restriction of the pipe into the drainFlue MINHorizontal Flue Systems Flue OptionsHorizontal Flue System Examples This bend is equivalent to 0.5 metreTotal equivalent length Vertical Flue System Examples Twin PipeTwin & Vertical Flue Systems 17.2 + 34.4 = 51.6 metresFlue Group B Flue AccessoriesCDS Flue Group PFor Twin Flue Systems For Vertical Flues For Vertical Flue SystemsFor Twin Flues Terminal Guard Fig Flue DimensionsFor Roof Terminals Flue Deflector aPlume Displacement Plume Displacement Kit P.D.KDetermining Permissible Lengths P.D.K Min metres Min .3 metres General Fitting Notes P.D.KThis section of the flue Must be horizontal Fig. H Installation Fitting the Standard Flue Flue Inner Flue Support BracketInner Flue Support Bracket Flue Elbow Gasket Flue Trim PointsMaking the Condensate Drain ConnectionCable Clamp Way Terminal Block Making The Electrical ConnectionsIntegral Programmer Green/Yellow Schematic Wiring DiagramElectrical Fuse 3.15 ATIllustrated Wiring Diagram PCBCommissioning the Boiler Commissioning the BoilerPriming the Condensate Pump Check the Operational Working Gas Inlet Pressure Fitting The Case Panels & Facia 13.2 ‘Benchmark’ ChecklistCompletion HandoverServicing the Boiler Annual ServicingEarth Combustion Box Door Panel Annual Servicing InspectionAir Box Door Panel Spark Sleeve InsulationLock Nut Service Drain Plug Central Insulation Panel Pipe may be removed to increase accessCracks/damage. Clean with a soft brush To it FigChanging Components Flow Temperature Thermistor and Safety Thermostat FigChanging Components & Preparation Drain the boiler see .1 paragraph 2 Condensate Pump Complete aClip Check operation of the pump See SectionChanging Components Spark and Sensing Electrodes Fig Condensate Trap Fig Injector Pipe FigGas Valve Fig Securing Nut Sensor Leads Condensate Trap Lock NutHeat Exchanger Heat Exchanger Manifold AssemblyCombustion Box Door Panel Burner Support Bracket Burner Securing Screws Short Parts List Short Parts ListKey Description Fault Finding 240V at C ? 240V at a ?240V at B ? 240V at D ?System full of water ? Wires from inline Connector to PCB faultyViewed from Wire Entry end Replace Flow Switch Pump running ?Replace PCB Way Connector Lead from PCB to Gas Valve faulty Wiring from PCBRectify wiring Is there Gas at gas valve inlet ?Lights On Off Replace Stat Replace fan Lights Rectify wiring Viewed from Wire Entry end ‘A’ ‘C’ ‘D’ ‘B’YES Condensing Boilers only Service Record Potterton Brooks House, Coventry Road, Warwick. CV34 4LL Comp No 6/11