Baxi Potterton Gold FSB 30 HE manual System Controls & Wiring

Page 13

Key to colours

b- Blue br - Brown

w - White

o- Orange

gr - Grey

g/y - Green/Yellow

230V

 

 

 

50Hz

 

 

Y Plan

L N E

b

 

 

g/y

w

Diverter

 

 

 

 

Cylinder

Valve

 

 

Stat

gr

 

Room

1

o

 

 

 

 

 

 

Stat

C 2

 

 

 

 

System Control

 

S/L

E

N

P/L

 

 

 

 

Boiler Connection

Wiring Centre

 

 

 

 

 

 

 

 

(4 Core Wire)

 

 

 

 

 

Timer

 

 

 

 

 

L

 

 

 

 

 

N

N E

L

 

 

 

CH on

 

 

 

HW on

 

 

 

 

 

HW off

Pump

 

 

 

Y Plan, Room Thermostat System, CH Interlocked By Room Thermostat, DHW Interlocked By Cylinder Thermostat

At least the Radiator(s) near the Room Thermostat not TRV’d

Pump run from Switched Live

6.0System Details

6.6System Controls & Wiring

This boiler requires a permanent live for operation of the condensate pump and frost protection.

1.To comply with Part L1 of the Building Regulations the heating system into which the boiler is installed should include the following:

a)zone controls

b)timing controls

c)boiler control interlocks

2.Such a system needs to be fully pumped and must provide independent temperature and time control to both the heating and hot water circuits and have a boiler and system pump interlock.

3.The boiler should be controlled so that it operates on demand only. Where it is proposed to effect control by thermostatic radiator valves a room thermostat should also be provided to switch off the boiler when there is no demand for heating.

230V

50Hz

L N E

System Control

Wiring Centre

Timer

L

N

CH on

HW on

 

 

b

gr

gr

 

 

 

 

 

b

Motor

 

Motor

 

 

br

 

 

 

br

S Plan

o

g/y S Plan

g/y

Valve

 

Valve

 

Room

Cylinder

o

 

Stat

Stat

 

S/L E N P/L

Boiler Connection

(4 Core Wire)

N E L

Pump

S Plan, Room Thermostat System, CH Interlocked By Room Thermostat, DHW Interlocked By Cylinder Thermostat

At least the Radiator(s) near the Room Thermostat not TRV’d Pump run from Switched Live

© Baxi Heating UK Ltd 2011

13

Image 13 Contents
FSB 30 HE Potterton Gold FSB 30 HE No 592 Natural GasScheme Members only Installer Notification GuidelinesGas Safety Installation & Use Regulations Important Installation, Commissioning, Service & RepairLegislation Codes of Practice, most recent version should be usedContents Description IntroductionImportant Information Position of Optional Integral Timer Wiring Flow Temperature Thermistor RedGeneral Layout Layout Figs , 4, 5Boiler Operation Boiler OperationAll TRVs Shut Down ? Minute Anti-cycle CAT I 2H Technical DataIpxx Dimensions and Fixings Water Circulating Systems System DetailsTreatment of Water Circulating Systems Pipework Low Head InstallationAir Vents System Controls & Wiring Sealed Systems Fig Location Site RequirementsCompartment Gas Supply Clearances Figs &16Electrical Supply 5mm Min 500mm Min For Servicing Purposes 390mmCondensate Disposal Condensate Drain GeneralSink Site Requirement± 10 from vertical Blockage or restriction of the pipe into the drainMIN FlueHorizontal Flue System Examples Flue OptionsHorizontal Flue Systems This bend is equivalent to 0.5 metreTwin & Vertical Flue Systems Vertical Flue System Examples Twin PipeTotal equivalent length 17.2 + 34.4 = 51.6 metresCDS Flue AccessoriesFlue Group B Flue Group PFor Twin Flue Systems For Vertical Flues For Vertical Flue SystemsFor Twin Flues For Roof Terminals Flue DimensionsTerminal Guard Fig Flue Deflector aPlume Displacement Kit P.D.K Plume DisplacementDetermining Permissible Lengths P.D.K Min metres Min .3 metres General Fitting Notes P.D.KThis section of the flue Must be horizontal Fig. H Installation Flue Inner Flue Support Bracket Fitting the Standard FluePoints Inner Flue Support Bracket Flue Elbow Gasket Flue TrimConnection Making the Condensate DrainCable Clamp Way Terminal Block Making The Electrical ConnectionsIntegral Programmer Electrical Schematic Wiring DiagramGreen/Yellow Fuse 3.15 ATPCB Illustrated Wiring DiagramCommissioning the Boiler Commissioning the BoilerPriming the Condensate Pump Check the Operational Working Gas Inlet Pressure Completion 13.2 ‘Benchmark’ ChecklistFitting The Case Panels & Facia HandoverAnnual Servicing Servicing the BoilerAir Box Door Panel Spark Sleeve Annual Servicing InspectionEarth Combustion Box Door Panel InsulationCracks/damage. Clean with a soft brush Pipe may be removed to increase accessLock Nut Service Drain Plug Central Insulation Panel To it FigChanging Components Flow Temperature Thermistor and Safety Thermostat FigChanging Components & Preparation Clip Condensate Pump Complete aDrain the boiler see .1 paragraph 2 Check operation of the pump See SectionChanging Components Spark and Sensing Electrodes Fig Gas Valve Fig Injector Pipe FigCondensate Trap Fig Securing Nut Sensor Leads Condensate Trap Lock NutHeat Exchanger Heat Exchanger Manifold AssemblyCombustion Box Door Panel Burner Support Bracket Burner Securing Screws Short Parts List Short Parts ListKey Description Fault Finding 240V at B ? 240V at a ?240V at C ? 240V at D ?Viewed from Wire Entry end Replace Flow Switch Wires from inline Connector to PCB faultySystem full of water ? Pump running ?Rectify wiring Wiring from PCBReplace PCB Way Connector Lead from PCB to Gas Valve faulty Is there Gas at gas valve inlet ?Lights On Off Replace Stat Replace fan Lights Rectify wiring Viewed from Wire Entry end ‘A’ ‘C’ ‘D’ ‘B’YES Condensing Boilers only Service Record Brooks House, Coventry Road, Warwick. CV34 4LL Comp No 6/11 Potterton