Baxi Potterton Gold FSB 30 HE Making The Electrical Connections, Cable Clamp Way Terminal Block

Page 33

Fig. 31

Cable Clamp

Fig. 32

4-way Terminal Block

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 33

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

S/L

 

 

 

 

 

 

 

N

 

P/L

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wiring from System

Controls

S/L Switched Live

Earth

N Neutral

P/L Permanent Live

© Baxi Heating UK Ltd 2011

10.0Installation

10.7Making The Electrical Connections

WARNING: This boiler must be earthed

IMPORTANT: Four core cable is required to supply the boiler as a permanent live is necessary for the operation of the condensate pump and frost protection.

1.The electrical connections are on the right hand side of the boiler. Depending upon the nature of the installation it may be preferable to wire up to the boiler first before manoeuvering into position.

2.Undo the two screws securing the cable clamp and place to one side (Fig. 31).

3.Route the incoming electrical cable(s) from the system control wiring centre through the grommet in rear of the boiler and the grommet in the support bracket. This will prevent damage to the cable(s).

4.Lay the cable through the cable clamp to gauge the length of wire required when it is connected to the 4-way terminal block.

5.Connect the (S/L), ( ), (N) and (P/L) wires to the

4-way terminal block (Fig. 33) and refit the cable clamp (Fig. 31).

INTEGRAL PROGRAMMER

If the optional integral programmer is being fitted it can be done at this stage. Consult the instructions supplied in the programmer kit.

Check the electrical installation for;

earth continuity, short circuits, resistance to earth, correct polarity and fuse rating.

33

Image 33
Contents FSB 30 HE Potterton Gold FSB 30 HE No 592 Natural GasScheme Members only Installer Notification GuidelinesGas Safety Installation & Use Regulations Important Installation, Commissioning, Service & RepairLegislation Codes of Practice, most recent version should be usedContents Introduction DescriptionImportant Information Position of Optional Integral Timer Wiring Flow Temperature Thermistor RedGeneral Layout Layout Figs , 4, 5Boiler Operation Boiler OperationAll TRVs Shut Down ? Minute Anti-cycle Technical Data CAT I 2HIpxx Dimensions and Fixings System Details Water Circulating SystemsTreatment of Water Circulating Systems Low Head Installation PipeworkAir Vents System Controls & Wiring Sealed Systems Fig Site Requirements LocationCompartment Gas Supply Clearances Figs &16Electrical Supply 5mm Min 500mm Min For Servicing Purposes 390mmCondensate Disposal Condensate Drain GeneralSink Site Requirement± 10 from vertical Blockage or restriction of the pipe into the drainMIN FlueHorizontal Flue System Examples Flue OptionsHorizontal Flue Systems This bend is equivalent to 0.5 metreTwin & Vertical Flue Systems Vertical Flue System Examples Twin PipeTotal equivalent length 17.2 + 34.4 = 51.6 metresCDS Flue AccessoriesFlue Group B Flue Group PFor Vertical Flues For Vertical Flue Systems For Twin Flue SystemsFor Twin Flues For Roof Terminals Flue DimensionsTerminal Guard Fig Flue Deflector aPlume Displacement Kit P.D.K Plume DisplacementDetermining Permissible Lengths P.D.K General Fitting Notes P.D.K Min metres Min .3 metresThis section of the flue Must be horizontal Fig. H Installation Flue Inner Flue Support Bracket Fitting the Standard FluePoints Inner Flue Support Bracket Flue Elbow Gasket Flue TrimConnection Making the Condensate DrainMaking The Electrical Connections Cable Clamp Way Terminal BlockIntegral Programmer Electrical Schematic Wiring DiagramGreen/Yellow Fuse 3.15 ATPCB Illustrated Wiring DiagramCommissioning the Boiler Commissioning the BoilerPriming the Condensate Pump Check the Operational Working Gas Inlet Pressure Completion 13.2 ‘Benchmark’ ChecklistFitting The Case Panels & Facia HandoverAnnual Servicing Servicing the BoilerAir Box Door Panel Spark Sleeve Annual Servicing InspectionEarth Combustion Box Door Panel InsulationCracks/damage. Clean with a soft brush Pipe may be removed to increase accessLock Nut Service Drain Plug Central Insulation Panel To it FigFlow Temperature Thermistor and Safety Thermostat Fig Changing ComponentsChanging Components & Preparation Clip Condensate Pump Complete aDrain the boiler see .1 paragraph 2 Check operation of the pump See SectionChanging Components Spark and Sensing Electrodes Fig Gas Valve Fig Injector Pipe FigCondensate Trap Fig Securing Nut Sensor Leads Condensate Trap Lock NutHeat Exchanger Manifold Assembly Heat ExchangerCombustion Box Door Panel Burner Support Bracket Burner Securing Screws Short Parts List Short Parts ListKey Description Fault Finding 240V at B ? 240V at a ?240V at C ? 240V at D ?Viewed from Wire Entry end Replace Flow Switch Wires from inline Connector to PCB faultySystem full of water ? Pump running ?Rectify wiring Wiring from PCBReplace PCB Way Connector Lead from PCB to Gas Valve faulty Is there Gas at gas valve inlet ?Lights On Off Replace Stat Replace fan Lights Rectify wiring Viewed from Wire Entry end ‘C’ ‘D’ ‘B’ ‘A’YES Condensing Boilers only Service Record Brooks House, Coventry Road, Warwick. CV34 4LL Comp No 6/11 Potterton

Gold FSB 30 HE specifications

The Baxi Potterton Gold FSB 30 HE is a high-efficiency system boiler designed to meet the demands of modern homes while providing exceptional performance and reliability. As part of the Baxi Potterton Gold range, this model combines advanced engineering with user-friendly features, making it a top choice for homeowners and installers alike.

One of the primary features of the Baxi Potterton Gold FSB 30 HE is its impressive efficiency rating. With an ErP rating of A for heat and a seasonal efficiency of up to 90%, this boiler not only reduces energy consumption but also helps in lowering utility bills. The high-efficiency design ensures that more of the fuel consumed is converted into usable heat, making it an environmentally friendly option.

The boiler utilizes a lightweight design, weighing in at just 30 kg, which makes it easy to transport and install. Its compact size allows for flexibility in siting, meaning it can fit comfortably in kitchen cupboards or utility rooms without taking up excessive space. The small footprint caters to property owners looking to save on installation areas while still having a powerful heating system.

In terms of technology, the Baxi Potterton Gold FSB 30 HE features an integral thermostat and a user-friendly LCD display for easy boiler operation and maintenance. This advanced control system provides homeowners with accurate temperature readings and the ability to adjust settings with ease. The built-in diagnostics feature simplifies fault-finding and allows for quick resolutions, minimizing downtime.

The boiler is also equipped with weather compensation technology, which adjusts the heating output based on the external temperature. This ensures optimal performance year-round, maintaining a comfortable environment inside the home and optimizing energy use.

Safety features are paramount in the design of the Baxi Potterton Gold FSB 30 HE. It includes a range of built-in safeguards, such as a frost protection mode and an overheat thermostat, giving users peace of mind. Moreover, it is compatible with various heating controls and can be linked to smart home systems, offering further convenience and energy-saving options.

Overall, the Baxi Potterton Gold FSB 30 HE stands out for its efficiency, compact design, and advanced technology, making it a reliable solution for domestic heating needs. With a solid reputation for quality and performance, the Gold FSB 30 HE continues to be a favored choice for those looking to invest in an effective system boiler.