Inner Flue Support Bracket
Fig. 28
Flue
Flue Elbow
Fig. 29
Gasket
Fig. 30
Flue Trim
Shaded Areas indicate |
Recommended Handling |
Points |
10.0Installation
10.5Fitting the Standard Flue (Cont)
7.Ensure the inner flue support bracket is positioned in the flue (Fig. 28).
8.Engage the flue into the flue elbow using soap solution to ease the engagement, ensuring the flue terminal is positioned as shown (Fig. 29).
9.Place the gasket over the flue exit on the boiler.
10.Slide the flue assembly through the hole in the wall.
11.Engage the elbow on to the flue connection on top of the boiler. Secure with the four screws supplied in the kit.
12.Make good between the wall and air duct outside the building ensuring the 3° drop between the terminal and elbow.
13.The flue trim should be fitted once the installation is complete and the flue secure (Fig. 30). Apply a suitable mastic to the inside of the trim and press against the wall finish, making sure the brickwork is dust free and dry.
14.If necessary fit a flue plume deflector kit and/or terminal guard (see Sections 7.6 & 8.8).
© Baxi Heating UK Ltd 2011 | 31 |