Inner Flue Support Bracket

Fig. 28

Flue

Flue Elbow

Fig. 29

Gasket

Fig. 30

Flue Trim

Shaded Areas indicate

Recommended Handling

Points

10.0Installation

10.5Fitting the Standard Flue (Cont)

7.Ensure the inner flue support bracket is positioned in the flue (Fig. 28).

8.Engage the flue into the flue elbow using soap solution to ease the engagement, ensuring the flue terminal is positioned as shown (Fig. 29).

9.Place the gasket over the flue exit on the boiler.

10.Slide the flue assembly through the hole in the wall.

11.Engage the elbow on to the flue connection on top of the boiler. Secure with the four screws supplied in the kit.

12.Make good between the wall and air duct outside the building ensuring the 3° drop between the terminal and elbow.

13.The flue trim should be fitted once the installation is complete and the flue secure (Fig. 30). Apply a suitable mastic to the inside of the trim and press against the wall finish, making sure the brickwork is dust free and dry.

14.If necessary fit a flue plume deflector kit and/or terminal guard (see Sections 7.6 & 8.8).

© Baxi Heating UK Ltd 2011

31

Image 31 Contents
FSB 30 HE Potterton Gold FSB 30 HE No 592 Natural GasScheme Members only Installer Notification GuidelinesCodes of Practice, most recent version should be used Important Installation, Commissioning, Service & RepairGas Safety Installation & Use Regulations LegislationContents Description IntroductionImportant Information Layout Figs , 4, 5 Flow Temperature Thermistor RedPosition of Optional Integral Timer Wiring General LayoutBoiler Operation Boiler OperationAll TRVs Shut Down ? Minute Anti-cycle CAT I 2H Technical DataIpxx Dimensions and Fixings Water Circulating Systems System DetailsTreatment of Water Circulating Systems Pipework Low Head InstallationAir Vents System Controls & Wiring Sealed Systems Fig Location Site RequirementsCompartment 5mm Min 500mm Min For Servicing Purposes 390mm Clearances Figs &16Gas Supply Electrical SupplyCondensate Disposal Condensate Drain GeneralBlockage or restriction of the pipe into the drain Site RequirementSink ± 10 from verticalMIN FlueThis bend is equivalent to 0.5 metre Flue OptionsHorizontal Flue System Examples Horizontal Flue Systems17.2 + 34.4 = 51.6 metres Vertical Flue System Examples Twin PipeTwin & Vertical Flue Systems Total equivalent lengthFlue Group P Flue AccessoriesCDS Flue Group BFor Twin Flue Systems For Vertical Flues For Vertical Flue SystemsFor Twin Flues Flue Deflector a Flue DimensionsFor Roof Terminals Terminal Guard FigPlume Displacement Kit P.D.K Plume DisplacementDetermining Permissible Lengths P.D.K Min metres Min .3 metres General Fitting Notes P.D.KThis section of the flue Must be horizontal Fig. H Installation Flue Inner Flue Support Bracket Fitting the Standard FluePoints Inner Flue Support Bracket Flue Elbow Gasket Flue TrimConnection Making the Condensate DrainCable Clamp Way Terminal Block Making The Electrical ConnectionsIntegral Programmer Fuse 3.15 AT Schematic Wiring DiagramElectrical Green/YellowPCB Illustrated Wiring DiagramCommissioning the Boiler Commissioning the BoilerPriming the Condensate Pump Check the Operational Working Gas Inlet Pressure Handover 13.2 ‘Benchmark’ ChecklistCompletion Fitting The Case Panels & FaciaAnnual Servicing Servicing the BoilerInsulation Annual Servicing InspectionAir Box Door Panel Spark Sleeve Earth Combustion Box Door PanelTo it Fig Pipe may be removed to increase accessCracks/damage. Clean with a soft brush Lock Nut Service Drain Plug Central Insulation PanelChanging Components Flow Temperature Thermistor and Safety Thermostat FigChanging Components & Preparation Check operation of the pump See Section Condensate Pump Complete aClip Drain the boiler see .1 paragraph 2Changing Components Spark and Sensing Electrodes Fig Securing Nut Sensor Leads Condensate Trap Lock Nut Injector Pipe FigGas Valve Fig Condensate Trap FigHeat Exchanger Heat Exchanger Manifold AssemblyCombustion Box Door Panel Burner Support Bracket Burner Securing Screws Short Parts List Short Parts ListKey Description Fault Finding 240V at D ? 240V at a ?240V at B ? 240V at C ?Pump running ? Wires from inline Connector to PCB faultyViewed from Wire Entry end Replace Flow Switch System full of water ?Is there Gas at gas valve inlet ? Wiring from PCBRectify wiring Replace PCB Way Connector Lead from PCB to Gas Valve faultyLights On Off Replace Stat Replace fan Lights Rectify wiring Viewed from Wire Entry end ‘A’ ‘C’ ‘D’ ‘B’YES Condensing Boilers only Service Record Brooks House, Coventry Road, Warwick. CV34 4LL Comp No 6/11 Potterton