State Industries Green Choice instruction manual

Page 16

14.Install the vent collar assembly through the wall, connecting it to the extension and/or elbow depending on which one was used.

FIGURE 45.

15.Four wood screws are supplied to temporarily attach the collar to the exterior wall of the building. However, other types of screws may have to be substituted depending on the construction material of the exterior wall.

FIGURE46.

16.Insert the 3” (76 mm) diameter flue extension pipe into the vent collar assembly (flared and notched end first) and rotate clockwise to lock the studs to the slots in the extension pipe.

FIGURE 47.

17.Connect the vent cap by sliding it’s end over the 3” (7.6 cm) diam- eter extension pipe an O-ring.

NOTE: to facilitate ease of assembly of the vent cap to the 3” (7.6 cm) pipe a soap solution can be applied to the O-ring gasket.

FIGURE48.

18.The vent cap has four holes around the outer edge. Remove the four screws used to temporarily attach the collar to the exterior wall. Then secure the vent cap to the exterior wall using the same four screws.

NOTE: Screws are supplied. However, substitution may be necessary depending on the exterior wall material.

FIGURE 49.

19.Go back indoors to attach inside collar to the inside wall. Place thecollar against the wall. Secure to wall by using four long sheet metal screws.

NOTE: Screws are supplied. However, substitution may be necessary depending on the exterior wall material.

FIGURE50.

20.Using the tube of sealant supplied, apply an ample amount of sealant around the edge of the vent pipe where it is inserted through the inside collar. This will seal air draft from the walls.

FIGURE 51.

16

Image 16
Contents Residential Direct Vent GAS Water Heaters Safe INSTALLATION, USE and Service Important DefinitionsGeneral Safety Table of Contents IntroductionTypical Installation GET to Know Your Water Heater GAS ModelsMixing Valve Usage Locating the NEW Water Heater Facts to Consider about the LocationCombustion Air and Ventilation Venting ClearancesOptional Wire Grill Flue ExtensionsChart #1 Chart #2Vertical Height Extension Kit Horizontal Extension KitALL Installations Standard Vent Kit Installation #1Cutting The Opening Through The Outside Wall Water Heater AttitudePage Page Chart #3 GAL CAP BTU’s in 1000’s NAT./L.PPage Page Optional Horizontal Vent Kit Installation #3 Page Optional Vertical and Horizontal Vent Kit Installation #4 Through The Outside Wall. SeeChart #4 GAL CAP Collar Optional Vent Cap Porcelain-Enameled Page Page Installing the NEW Water Heater Water PipingTEMPERATURE-PRESSURE Relief Valve Valve and Pipe InsulationFilling the Water Heater GAS Piping Sediment Traps GAS Piping with Flexible ConnectorGAS Piping with ALL Black Iron Pipe to GAS Control Installation Checklist Before Lighting the PilotPage Temperature Regulation For Your InformationStart UP Conditions CondensateOperational Conditions Periodic Maintenance Burner CleaningGAS Control Valve & Burner Assembly Venting System InspectionTEMPERATURE-PRESSURE Relief Valve Operation HousekeepingAnode ROD Inspection DrainingDrain Valve Washer Replacement Leakage CheckpointsRepair Parts List Parts GAL. CAP KEY # Description BTU’s in 1000’s NAT/L.P 36/36 38/38 40/40 48/44 55 NATRepair Parts List This is a Repair Parts LIST, not a Packing List BTU’s in 1000’s NAT/L.P 36/36 38/38 40/40 48/44Troubleshooting Guidelines Page Page