State Industries Green Choice Combustion Air and Ventilation, Venting Clearances

Page 8

Also, the water heater must be located and/or protected so it is not subject to physical damage by a moving vehicle.

This water heater must not be installed directly on carpeting. Carpeting must be protected by metal or wood panel beneath the appliance extending beyond the full width and depth of the appliance by at least 3 inches (7.62 cm) in any direction, or if the appliance is installed in an alcove or closet, the entire floor must be covered by the panel. Failure to heed this warning may result in a fire hazard.

Minimum clearances between the water heater and combustible and noncombustible construction are 0 inch at the sides, 0 inches from back, 4(10.2 cm) from front of jacket to closet door and 3(7.6 cm) from top of jacket to combustible and noncombustible material. Minimum vent clearance: 0 inches.

FIGURE3.

NOTE: Provide 24 inches (61 cm) front clearance for servicing and a adequate clearance between the jacket top and ceiling for servicing the flue area.

Combustion Air and Ventilation

No vent damper, whether it is operated thermally or otherwise, is to be installed on this direct vent water heater. Alteration of any part of the factory-furnished vent assembly could result in improper operation due to restriction of flue gases and may cause carbon monoxide poisoning.

Venting Clearances

When determining the installation location for a direct vent water heater, snow accumulation and drifting should be considered in areas where applicable. See Figures 4 through 8 and items below.

18” minimum in all directions from any obstruction that may interfere.

18” minimum from the ground and 12 “ from ceiling overhangs.

The direct vent terminal shall terminate at least 3 feet above any forced air inlet located within 10 feet. See Figure 5.

9” minimum horizontally from or above any door, window or gravity air inlet into the building (50,000 BtuH input or less.)

12” minimum horizontally from or above any door, window or gravity air inlet into the building (over 50,000 BtuH input).

12” minimum below any door, window or gravity air inlet into the building (50,000 BtuH input or less).

18” minimum below any door, window or gravity air inlet into the building (over 50,000 BtuH input).

18” minimum from other gravity or natural appliance outlet vents when directly above or 135° to either side of center line. See Figure 6.

36” minimum from any outlet vents when directly below or 45° to either side of center line. See Figure 7.

36” minimum in all directions from any other forced air appliance outlet vent. See Figure 7.

The location selection must provide clearances for servicing and proper operation of the water heater. See Figure 8.

Vent termination must not be within 4 feet of any items such as gas meters, gas valves or other gas regulating equipment.

Unless specified at time of ordering, a standard extension kit (No. 9000687) is individually packaged and shipped with the water heater.

FIGURE 4.

8

Image 8
Contents Residential Direct Vent GAS Water Heaters Safe INSTALLATION, USE and Service Important DefinitionsGeneral Safety Table of Contents Introduction Typical Installation GET to Know Your Water Heater GAS ModelsMixing Valve Usage Locating the NEW Water Heater Facts to Consider about the LocationCombustion Air and Ventilation Venting ClearancesOptional Wire Grill Flue ExtensionsChart #1 Chart #2Vertical Height Extension Kit Horizontal Extension KitALL Installations Standard Vent Kit Installation #1Cutting The Opening Through The Outside Wall Water Heater AttitudePage Page Chart #3 GAL CAP BTU’s in 1000’s NAT./L.PPage Page Optional Horizontal Vent Kit Installation #3 Page Optional Vertical and Horizontal Vent Kit Installation #4 Through The Outside Wall. SeeChart #4 GAL CAP Collar Optional Vent Cap Porcelain-Enameled Page Page Installing the NEW Water Heater Water PipingTEMPERATURE-PRESSURE Relief Valve Valve and Pipe InsulationFilling the Water Heater GAS Piping GAS Piping with ALL Black Iron Pipe to GAS Control GAS Piping with Flexible ConnectorSediment Traps Installation Checklist Before Lighting the PilotPage Temperature Regulation For Your InformationStart UP Conditions CondensateOperational Conditions Periodic Maintenance Burner CleaningGAS Control Valve & Burner Assembly Venting System InspectionTEMPERATURE-PRESSURE Relief Valve Operation HousekeepingAnode ROD Inspection DrainingDrain Valve Washer Replacement Leakage CheckpointsRepair Parts List Parts GAL. CAP KEY # Description BTU’s in 1000’s NAT/L.P 36/36 38/38 40/40 48/44 55 NATRepair Parts List This is a Repair Parts LIST, not a Packing List BTU’s in 1000’s NAT/L.P 36/36 38/38 40/40 48/44Troubleshooting Guidelines Page Page