State Industries Green Choice instruction manual Collar

Page 21

8. Be sure the 6” (15.2 cm) diameter elbow is centered around the 3”

11. Slide the 6” (15.2 cm) telescoping vent section apart to expose the

(7.6 cm) diameter flue, secure using two sheet metal screws at the

beads. Use the supplied tube of caulking and fill the exposed beads.

connection of the elbow and the 6”(15.2 cm) vertical extension.

 

FIGURE 82.

12. Insert the 6” (15.2 cm) telescoping vent section into the wall.

FIGURE79.

9. Slide the vent collar(to be installed later)over the 6” (15.2cm) vent elbow.

FIGURE 83.

13. The remaining vent parts will be installed from the outside. Apply ample amount of sealant to the inside surface of the collar assembly that will contact the exterior wall. Also, apply sealant to the bead around the outside edge at the end of the 6” (15.2 cm) diameter vent

FIGURE80.collar.

10. Move the water heater into position at the vent opening.

FIGURE 84.

14. Install the vent collar assembly through the wall, connecting to the 6” (15.2 cm) telescoping extension. Remember, the extension is not connected and may be necessary to return indoors to push the extension back against the interior wall for a tight fit to the collar.

FIGURE81.

FIGURE85.

21

Image 21
Contents Residential Direct Vent GAS Water Heaters Important Definitions Safe INSTALLATION, USE and ServiceGeneral Safety Introduction Table of ContentsGET to Know Your Water Heater GAS Models Typical InstallationMixing Valve Usage Facts to Consider about the Location Locating the NEW Water HeaterVenting Clearances Combustion Air and VentilationFlue Extensions Optional Wire GrillChart #2 Chart #1Vertical Height Extension Kit Horizontal Extension KitStandard Vent Kit Installation #1 ALL InstallationsCutting The Opening Through The Outside Wall Water Heater AttitudePage Page BTU’s in 1000’s NAT./L.P Chart #3 GAL CAPPage Page Optional Horizontal Vent Kit Installation #3 Page Through The Outside Wall. See Optional Vertical and Horizontal Vent Kit Installation #4Chart #4 GAL CAP Collar Optional Vent Cap Porcelain-Enameled Page Page Water Piping Installing the NEW Water HeaterValve and Pipe Insulation TEMPERATURE-PRESSURE Relief ValveFilling the Water Heater GAS Piping GAS Piping with Flexible Connector Sediment TrapsGAS Piping with ALL Black Iron Pipe to GAS Control Before Lighting the Pilot Installation ChecklistPage For Your Information Temperature RegulationStart UP Conditions CondensateOperational Conditions Burner Cleaning Periodic MaintenanceGAS Control Valve & Burner Assembly Venting System InspectionHousekeeping TEMPERATURE-PRESSURE Relief Valve OperationAnode ROD Inspection DrainingLeakage Checkpoints Drain Valve Washer ReplacementRepair Parts List BTU’s in 1000’s NAT/L.P 36/36 38/38 40/40 48/44 55 NAT Parts GAL. CAP KEY # DescriptionRepair Parts List BTU’s in 1000’s NAT/L.P 36/36 38/38 40/40 48/44 This is a Repair Parts LIST, not a Packing ListTroubleshooting Guidelines Page Page