Bradford-White Corp BWCH, BWCV warranty Hydronic Piping Multiple Boilers, Low Temperature System

Page 16

Page 16

BRADFORD WHITE CORP.

 

 

 

 

 

C

SYSTEM

 

RETURN

B

 

A

PUMP LOCATION FOR

NON-PUMP-MOUNTED UNITS

T1

COLD WATER

MAKE-UP

C

 

SYSTEM

SYSTEM PUMP

SUPPLY

B

A

ADJUSTMENT PROCEDURE TO MAINTAIN 120°F INLET TEMP:

1.Turn on boiler and open valves A & B.

2.After steady-state operation, if T1 is less than 120°F, slowly close valve B until T1 climbs to 120°F.

3.If T1 is greater than 120°F, slowly close valve A until T1 drops to 120°F.

4.Check after system operating temperature has stabilized. Make final adjustments.

T1

CAUTION: THIS DRAWING SHOWS SUGGESTED

 

 

PIPING CONFIGURATION AND VALVING, CHECK

PUMP LOCATION FOR PUMP-MOUNTED UNITS

WITH LOCAL CODES AND ORDINANCES FOR

ADDITIONAL REQUIREMENTS.

 

 

PRIMARY/SECONDARY MANDITORY FOR ALL

 

 

 

 

 

 

 

 

VARIABLE FLOW SYSTEMS

 

 

 

 

INSTALL AIR VENTS AT HIGH POINTS IN SYSTEM

LEGEND

 

 

PIPING & SIZING OF EXPANSION TANK

 

 

 

 

 

 

EXPANSION TANK

PER TANK MANUFACTURER'S INSTRUCTIONS

THERMOMETER

 

DIMENSION "C" (COMMON PIPING) TO BE FOUR

 

WITH AIR SCOOP AND

 

 

 

 

PIPE DIAMETERS, MAX. (NO ELBOWS OR VALVES)

 

 

AUTO AIR VENT

TEMPERATURE

PURGE

 

 

 

VALVE

 

 

BOILER CIRCUIT PIPING MUST BE EQUAL

SENSOR

 

 

 

 

3-WAY VALVE

TO BOILER WATER CONNECTION SIZE

GLOBE VALVE

 

BOILER CIRC. PUMP SIZED FOR FLOW THROUGH BOILER

 

 

 

 

 

 

 

CHECK VALVE

 

VALVE

 

DOTTED DEVICES INDICATE ALTERNATE LOCATIONS

 

 

 

 

 

 

PUT BOILER CONTROL SENSOR IN THE SYSTEM

 

 

 

 

PRESSURE REDUCING VALVE

 

 

SUPPLY WHEN USING THIS PIPING STYLE.

 

 

 

W/ FAST FILL BYPASS

PUMP

 

MINIMUM BOILER INLET WATER TEMPERATURE

 

 

 

 

MUST BE AT LEAST 120°F.

Figure 5. Hydronic Piping — Multiple Boilers, Low Temperature System.

Image 16
Contents Copper Brute Table of Contents Maintenance Trouble ShootingReplacement Parts Operating InstructionsIntroduction General InformationModel Identification Dimensions WarrantyLocating the Appliance Dimensional Data Inches 91cm horizontally Venting and Combustion Air Combustion AirCombustion Air From Room Intake Combustion AirVenting Vent CategoriesCategory I Vent Common Venting SystemsCombustion Air and Vent Through Side Wall Locating Vent & Combustion Air Terminals Category III VentSide Wall Vent Terminal Side Wall Combustion Air TerminalCommon Vent Test Boilers Vent Terminals for Outdoor UnitsVertical Vent Terminal Vertical Combustion Air TerminalGas Supply and Piping 61-91mWater Connections Copper Brute II Boiler 4A.1 Heating System Piping Hot Supply Connections Boiler4A.2 Cold Water Make-Up Boiler 4A.3 Water Flow Requirements BoilerHydronic Piping Multiple Boilers, Primary Secondary System Hydronic Piping Multiple Boilers, Low Temperature System Hydronic Piping One Boiler, Multi-Temperature System Hydronic Piping Primary-Secondary, Reverse-Return Boiler CIRC. Pump Sized for Flow Through Boiler Water Connections Copper Brute II Water Heater 4B.1 Water System Piping Water Heater4B.2 Hot Water Supply Piping Water Heater 4B.3 Water Flow Requirements Water Heater4B.5 Freeze Protection Water Heater SupplyWater Heater Piping Multiple Heaters, One Tank Water Heater Piping Multiple Heaters, Multiple Tanks Temperature Control Main PowerElectrical Connections Field Wiring Panel External Staging Control Wiring AvertissementCopper Brute II 500 750 Ladder Diagram Copper Brute II 1000 Ladder Diagram Copper Brute II 1250 2000 Ladder Diagram Copper Brute II 500 1000 Wiring Schematic Copper Brute II 1250 1500 Wiring Schematic Copper Brute II 1750 2000 Wiring Schematic Terminal designations are as indicated Field Wiring for Modes 1 Avertissement Sequence of Operation Operating InstructionsFilling the Boiler System Programming the Temperature Control Choosing the ModeSystem Piping Primary Secondary Piping Parallel PipingFor ALL Other Modes Hydronic Primary/Secondary Mode Choosing the Mode for your Application Mechanical aquastat in a domestic hot water storage tankMode 5 Primary secondary piping with outdoor reset Advanced Topics Staging ModeDifferential Boiler Target Temperature Boiler Minimum Boil MINBoiler Maximum Boil MAX Pump OperationSetpoint Operation Outdoor Reset OperationDedicated Domestic Hot Water Typical Gas Train Configuration Operating the Burner and Set Up Advanced Programming ModeSet Up for 0 to 2500 Feet Altitude External Boiler OperationShutting Down the Copper Brute High Altitude Adjustment and Set UpTo Restart the Copper Brute System Maintenance MaintenanceAppliance Maintenance Component Description Temperature Control Flow SwitchIgnition Controls IgnitorsBradford White Corp Trouble Shooting Troubleshooting the Temperature Control Troubleshooting Copper Brute ControlsCopper Brute II 500 Troubleshooting Error Codes Replacement Parts Parts ListSee Figures 35 Heat Exchanger Components Electrical Components Gas Train Components Burner Manifold Assy, 4 Burners, Left, LP For reference Internal Components Copper Brute II Hydronic Electrical Components H2214401F