Bradford-White Corp BWCV, BWCH, Copper Brute II Hydronic Boiler warranty For reference

Page 60

Page 60

BRADFORD WHITE CORP.

 

 

 

 

NOTE: Model 2000 shown

 

 

for reference.

13

 

 

 

14

16A

 

 

6

 

 

 

 

7

16C

 

 

BASE SHOWN

 

 

FOR REFERENCE

 

16

9

 

 

 

 

5A

12

1

 

 

 

 

 

11

16B

 

 

 

 

5

16D

 

 

 

 

2

3

 

 

8

4

 

 

 

 

 

10

Figure 33. Sheet Metal Components.

Image 60
Contents Copper Brute Table of Contents Maintenance Trouble ShootingReplacement Parts Operating InstructionsGeneral Information IntroductionModel Identification Warranty DimensionsLocating the Appliance Dimensional Data Inches 91cm horizontally Venting and Combustion Air Combustion AirCombustion Air From Room Intake Combustion AirVenting Vent CategoriesCategory I Vent Common Venting SystemsCombustion Air and Vent Through Side Wall Locating Vent & Combustion Air Terminals Category III VentSide Wall Vent Terminal Side Wall Combustion Air TerminalCommon Vent Test Boilers Vent Terminals for Outdoor UnitsVertical Vent Terminal Vertical Combustion Air TerminalGas Supply and Piping 61-91mWater Connections Copper Brute II Boiler 4A.1 Heating System Piping Hot Supply Connections Boiler4A.2 Cold Water Make-Up Boiler 4A.3 Water Flow Requirements BoilerHydronic Piping Multiple Boilers, Primary Secondary System Hydronic Piping Multiple Boilers, Low Temperature System Hydronic Piping One Boiler, Multi-Temperature System Hydronic Piping Primary-Secondary, Reverse-Return Boiler CIRC. Pump Sized for Flow Through Boiler Water Connections Copper Brute II Water Heater 4B.1 Water System Piping Water Heater4B.2 Hot Water Supply Piping Water Heater 4B.3 Water Flow Requirements Water Heater4B.5 Freeze Protection Water Heater SupplyWater Heater Piping Multiple Heaters, One Tank Water Heater Piping Multiple Heaters, Multiple Tanks Main Power Temperature ControlElectrical Connections Field Wiring Panel External Staging Control Wiring AvertissementCopper Brute II 500 750 Ladder Diagram Copper Brute II 1000 Ladder Diagram Copper Brute II 1250 2000 Ladder Diagram Copper Brute II 500 1000 Wiring Schematic Copper Brute II 1250 1500 Wiring Schematic Copper Brute II 1750 2000 Wiring Schematic Terminal designations are as indicated Field Wiring for Modes 1 Avertissement Operating Instructions Sequence of OperationFilling the Boiler System Programming the Temperature Control Choosing the ModeSystem Piping Primary Secondary Piping Parallel PipingFor ALL Other Modes Hydronic Primary/Secondary Mode Choosing the Mode for your Application Mechanical aquastat in a domestic hot water storage tankMode 5 Primary secondary piping with outdoor reset Staging Mode Advanced TopicsDifferential Boiler Target Temperature Boiler Minimum Boil MINBoiler Maximum Boil MAX Pump OperationOutdoor Reset Operation Setpoint OperationDedicated Domestic Hot Water Typical Gas Train Configuration Operating the Burner and Set Up Advanced Programming ModeSet Up for 0 to 2500 Feet Altitude External Boiler OperationHigh Altitude Adjustment and Set Up Shutting Down the Copper BruteTo Restart the Copper Brute Maintenance System MaintenanceAppliance Maintenance Component Description Temperature Control Flow SwitchIgnition Controls IgnitorsBradford White Corp Trouble Shooting Troubleshooting the Temperature Control Troubleshooting Copper Brute ControlsCopper Brute II 500 Troubleshooting Error Codes Replacement Parts Parts ListSee Figures 35 Heat Exchanger Components Electrical Components Gas Train Components Burner Manifold Assy, 4 Burners, Left, LP For reference Internal Components Copper Brute II Hydronic Electrical Components H2214401F
Related manuals
Manual 44 pages 23.82 Kb