Bradford-White Corp BWCV, BWCH warranty Terminal designations are as indicated

Page 33

COPPER BRUTE II (500 - 2000)

Page 33

Note: Positions of field wiring terminals may vary, but

terminal designations are as indicated.

Figure 22. Field Wiring.

Image 33
Contents Copper Brute Table of Contents Trouble Shooting MaintenanceReplacement Parts Operating InstructionsGeneral Information IntroductionModel Identification Warranty DimensionsLocating the Appliance Dimensional Data Inches 91cm horizontally Combustion Air Venting and Combustion AirCombustion Air From Room Intake Combustion AirVent Categories VentingCategory I Vent Common Venting SystemsCombustion Air and Vent Through Side Wall Category III Vent Locating Vent & Combustion Air TerminalsSide Wall Vent Terminal Side Wall Combustion Air TerminalVent Terminals for Outdoor Units Common Vent Test BoilersVertical Vent Terminal Vertical Combustion Air Terminal61-91m Gas Supply and Piping4A.1 Heating System Piping Hot Supply Connections Boiler Water Connections Copper Brute II Boiler4A.2 Cold Water Make-Up Boiler 4A.3 Water Flow Requirements BoilerHydronic Piping Multiple Boilers, Primary Secondary System Hydronic Piping Multiple Boilers, Low Temperature System Hydronic Piping One Boiler, Multi-Temperature System Hydronic Piping Primary-Secondary, Reverse-Return Boiler CIRC. Pump Sized for Flow Through Boiler 4B.1 Water System Piping Water Heater Water Connections Copper Brute II Water Heater4B.2 Hot Water Supply Piping Water Heater 4B.3 Water Flow Requirements Water HeaterSupply 4B.5 Freeze Protection Water HeaterWater Heater Piping Multiple Heaters, One Tank Water Heater Piping Multiple Heaters, Multiple Tanks Main Power Temperature ControlElectrical Connections Field Wiring Panel Avertissement External Staging Control WiringCopper Brute II 500 750 Ladder Diagram Copper Brute II 1000 Ladder Diagram Copper Brute II 1250 2000 Ladder Diagram Copper Brute II 500 1000 Wiring Schematic Copper Brute II 1250 1500 Wiring Schematic Copper Brute II 1750 2000 Wiring Schematic Terminal designations are as indicated Field Wiring for Modes 1 Avertissement Operating Instructions Sequence of OperationFilling the Boiler System Choosing the Mode Programming the Temperature ControlSystem Piping Primary Secondary Piping Parallel PipingFor ALL Other Modes Hydronic Primary/Secondary Mode Mechanical aquastat in a domestic hot water storage tank Choosing the Mode for your ApplicationMode 5 Primary secondary piping with outdoor reset Staging Mode Advanced TopicsDifferential Boiler Minimum Boil MIN Boiler Target TemperatureBoiler Maximum Boil MAX Pump OperationOutdoor Reset Operation Setpoint OperationDedicated Domestic Hot Water Typical Gas Train Configuration Advanced Programming Mode Operating the Burner and Set UpSet Up for 0 to 2500 Feet Altitude External Boiler OperationHigh Altitude Adjustment and Set Up Shutting Down the Copper BruteTo Restart the Copper Brute Maintenance System MaintenanceAppliance Maintenance Component Description Flow Switch Temperature ControlIgnition Controls IgnitorsBradford White Corp Trouble Shooting Troubleshooting Copper Brute Controls Troubleshooting the Temperature ControlCopper Brute II 500 Troubleshooting Error Codes Parts List Replacement PartsSee Figures 35 Heat Exchanger Components Electrical Components Gas Train Components Burner Manifold Assy, 4 Burners, Left, LP For reference Internal Components Copper Brute II Hydronic Electrical Components H2214401F
Related manuals
Manual 44 pages 23.82 Kb