24. Field Wiring for Mode 6.

4 stage boiler using

4 stage boiler using

4 stage boiler using

4 stage boiler using

4 control outputs

3 control outputs

2 control outputs

1 control output

1C

1NO

1C

1NO

1C

1NO

1C

1NO

 

 

 

 

 

Jumper

 

Jumper

2C

2NO

2C

2NO

2C

2NO

2C

2NO

 

 

 

 

 

 

 

Jumper

3C

3NO

3C

3NO

3C

3NO

3C

3NO

 

 

 

Jumper

 

Jumper

 

Jumper

4C

4NO

4C

4NO

4C

4NO

4C

4NO

 

4 stage

 

3 stage

 

2 stage

 

1 stage

WARNING

Improper field wiring may result in fire or explosion which can cause property damage, severe injury, or death. Make only wiring connections which are in accordance with the Installation and Operation manual.

AVERTISSEMENT

Un câblage incorrect lors de l’installation peut causer un incendie ou une explosion pouvant entraîner des dommages matériels, de graves blessures ou la mort. Ne faire seulement que les connexions conformes au Manuel d’installation et d’exploitation.

BRUTE II (500 - 2000)

1000 (3-Stage Boiler)

3 stage boiler using

3 stage boiler using

3 stage boiler using

3 control outputs

2 control outputs

1 control output

1C

1NO

1C

1NO

1C

1NO

 

 

 

Jumper

 

Jumper

2C

2NO

2C

2NO

2C

2NO

 

 

 

 

 

Jumper

3C

3NO

3C

3NO

3C

3NO

 

3 stage

 

2 stage

 

1 stage

The number of operational stages requires that the external control relay contacts be wired exactly as shown. Do not alter wiring.

Pennant 750 & 500 (2-Stage Boiler)

2 stage boiler using

2 stage boiler using

2 control outputs

1 control output

1C

1NO

1C

1NO

 

 

 

Jumper

2C

2NO

2C

2NO

 

2 stage

 

1 stage

Page 35

Image 35
Contents Copper Brute Table of Contents Operating Instructions MaintenanceTrouble Shooting Replacement PartsModel Identification General InformationIntroduction Locating the Appliance WarrantyDimensions Dimensional Data Inches 91cm horizontally Intake Combustion Air Venting and Combustion AirCombustion Air Combustion Air From RoomCommon Venting Systems VentingVent Categories Category I VentCombustion Air and Vent Through Side Wall Side Wall Combustion Air Terminal Locating Vent & Combustion Air TerminalsCategory III Vent Side Wall Vent TerminalVertical Combustion Air Terminal Common Vent Test BoilersVent Terminals for Outdoor Units Vertical Vent Terminal61-91m Gas Supply and Piping4A.3 Water Flow Requirements Boiler Water Connections Copper Brute II Boiler4A.1 Heating System Piping Hot Supply Connections Boiler 4A.2 Cold Water Make-Up BoilerHydronic Piping Multiple Boilers, Primary Secondary System Hydronic Piping Multiple Boilers, Low Temperature System Hydronic Piping One Boiler, Multi-Temperature System Hydronic Piping Primary-Secondary, Reverse-Return Boiler CIRC. Pump Sized for Flow Through Boiler 4B.3 Water Flow Requirements Water Heater Water Connections Copper Brute II Water Heater4B.1 Water System Piping Water Heater 4B.2 Hot Water Supply Piping Water HeaterSupply 4B.5 Freeze Protection Water HeaterWater Heater Piping Multiple Heaters, One Tank Water Heater Piping Multiple Heaters, Multiple Tanks Electrical Connections Main PowerTemperature Control Field Wiring Panel Avertissement External Staging Control WiringCopper Brute II 500 750 Ladder Diagram Copper Brute II 1000 Ladder Diagram Copper Brute II 1250 2000 Ladder Diagram Copper Brute II 500 1000 Wiring Schematic Copper Brute II 1250 1500 Wiring Schematic Copper Brute II 1750 2000 Wiring Schematic Terminal designations are as indicated Field Wiring for Modes 1 Avertissement Filling the Boiler System Operating InstructionsSequence of Operation Parallel Piping Programming the Temperature ControlChoosing the Mode System Piping Primary Secondary PipingFor ALL Other Modes Hydronic Primary/Secondary Mode Mechanical aquastat in a domestic hot water storage tank Choosing the Mode for your ApplicationMode 5 Primary secondary piping with outdoor reset Differential Staging ModeAdvanced Topics Pump Operation Boiler Target TemperatureBoiler Minimum Boil MIN Boiler Maximum Boil MAXDedicated Domestic Hot Water Outdoor Reset OperationSetpoint Operation Typical Gas Train Configuration External Boiler Operation Operating the Burner and Set UpAdvanced Programming Mode Set Up for 0 to 2500 Feet AltitudeTo Restart the Copper Brute High Altitude Adjustment and Set UpShutting Down the Copper Brute Appliance Maintenance Component Description MaintenanceSystem Maintenance Ignitors Temperature ControlFlow Switch Ignition ControlsBradford White Corp Trouble Shooting Troubleshooting Copper Brute Controls Troubleshooting the Temperature ControlCopper Brute II 500 Troubleshooting Error Codes Parts List Replacement PartsSee Figures 35 Heat Exchanger Components Electrical Components Gas Train Components Burner Manifold Assy, 4 Burners, Left, LP For reference Internal Components Copper Brute II Hydronic Electrical Components H2214401F