Bradford-White Corp BWCV, BWCH warranty Copper Brute II 500 1000 Wiring Schematic

Page 30

Page 30

 

BRADFORD WHITE CORP.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 19. Copper Brute II 500 - 1000 Wiring Schematic.

Image 30
Contents Copper Brute Table of Contents Replacement Parts MaintenanceTrouble Shooting Operating InstructionsGeneral Information IntroductionModel Identification Warranty DimensionsLocating the Appliance Dimensional Data Inches 91cm horizontally Combustion Air From Room Venting and Combustion AirCombustion Air Intake Combustion AirCategory I Vent VentingVent Categories Common Venting SystemsCombustion Air and Vent Through Side Wall Side Wall Vent Terminal Locating Vent & Combustion Air TerminalsCategory III Vent Side Wall Combustion Air TerminalVertical Vent Terminal Common Vent Test BoilersVent Terminals for Outdoor Units Vertical Combustion Air TerminalGas Supply and Piping 61-91m4A.2 Cold Water Make-Up Boiler Water Connections Copper Brute II Boiler4A.1 Heating System Piping Hot Supply Connections Boiler 4A.3 Water Flow Requirements BoilerHydronic Piping Multiple Boilers, Primary Secondary System Hydronic Piping Multiple Boilers, Low Temperature System Hydronic Piping One Boiler, Multi-Temperature System Hydronic Piping Primary-Secondary, Reverse-Return Boiler CIRC. Pump Sized for Flow Through Boiler 4B.2 Hot Water Supply Piping Water Heater Water Connections Copper Brute II Water Heater4B.1 Water System Piping Water Heater 4B.3 Water Flow Requirements Water Heater4B.5 Freeze Protection Water Heater SupplyWater Heater Piping Multiple Heaters, One Tank Water Heater Piping Multiple Heaters, Multiple Tanks Main Power Temperature ControlElectrical Connections Field Wiring Panel External Staging Control Wiring AvertissementCopper Brute II 500 750 Ladder Diagram Copper Brute II 1000 Ladder Diagram Copper Brute II 1250 2000 Ladder Diagram Copper Brute II 500 1000 Wiring Schematic Copper Brute II 1250 1500 Wiring Schematic Copper Brute II 1750 2000 Wiring Schematic Terminal designations are as indicated Field Wiring for Modes 1 Avertissement Operating Instructions Sequence of OperationFilling the Boiler System System Piping Primary Secondary Piping Programming the Temperature ControlChoosing the Mode Parallel PipingFor ALL Other Modes Hydronic Primary/Secondary Mode Choosing the Mode for your Application Mechanical aquastat in a domestic hot water storage tankMode 5 Primary secondary piping with outdoor reset Staging Mode Advanced TopicsDifferential Boiler Maximum Boil MAX Boiler Target TemperatureBoiler Minimum Boil MIN Pump OperationOutdoor Reset Operation Setpoint OperationDedicated Domestic Hot Water Typical Gas Train Configuration Set Up for 0 to 2500 Feet Altitude Operating the Burner and Set UpAdvanced Programming Mode External Boiler OperationHigh Altitude Adjustment and Set Up Shutting Down the Copper BruteTo Restart the Copper Brute Maintenance System MaintenanceAppliance Maintenance Component Description Ignition Controls Temperature ControlFlow Switch IgnitorsBradford White Corp Trouble Shooting Troubleshooting the Temperature Control Troubleshooting Copper Brute ControlsCopper Brute II 500 Troubleshooting Error Codes Replacement Parts Parts ListSee Figures 35 Heat Exchanger Components Electrical Components Gas Train Components Burner Manifold Assy, 4 Burners, Left, LP For reference Internal Components Copper Brute II Hydronic Electrical Components H2214401F
Related manuals
Manual 44 pages 23.82 Kb