Cleveland Range HA-MKGL-60-CC-T manual Field Conversion Instructions Natural Gas to Propane Gas

Page 42

FIELD CONVERSION INSTRUCTIONS - Natural Gas to Propane Gas

Power Burner Gas Kettles

 

BTU's per

Gas

Water

# of

 

Hour

Type

Column

Orifices

KGL-40,

140000

NAT

3.5

1

KGL-40-T,

140000

LP

3.5

1

MKGL-40-T,

 

 

 

 

KGL-60 to 100,

 

 

 

 

KGL-60-T to 80-T,

 

 

 

 

KGL-40-TSH,

190000

NAT

3.5

1

KGL-40-F to 60-F,

190000

LP

3.5

1

KGL-40-SH to 60-SH,

 

 

 

 

HA-MKGL-60 to 100,

 

 

 

 

HA-MKGL-60 to 100-T

 

 

 

 

TOP COVER

NOTE: Use thread sealant compatible with propane gas on all threaded piping connections.

1.Disconnect electrical connection.

2.Shut off main gas supply and disconnect kettle from supply line.

3.Remove TOP COVER.

4.Remove PLUG and SPRING.

5.Remove GAS ORIFICE and “O” RING.

6.Replace with new GAS ORIFICE and “O” RING.

7.Replace SPRING and PLUG.

8.Replace TOP COVER.

9.Place gas conversion label next to rating label.

10.Reconnect electrical supply.

“O” RING

GAS ORIFICE

SPRING

PLUG

Conversion Parts Required

KGL-40

Part No.

Description

Quantity

KE95549

Conversion Label

1

 

 

 

KE54420-1

Air Intake Washer

1

 

 

 

KE53403-5

Gas Orifice

1

 

 

 

FA05002-29

“O” Ring

1

 

 

 

KGL-60 to 100

Part No.

Description

Quantity

KE95549

Conversion Label

1

 

 

 

KE54420-1

Air Intake Washer

1

 

 

 

KE53403-7

Gas Orifice

1

 

 

 

FA05002-29

“O” Ring

1

 

 

 

Image 42
Contents Cleveland For the User Retain this Manual for Your ReferenceFor your safety Inspection GeneralVentilation Shipping Damage InstructionsGAS CleaningWarranty ElectricalSpecification Drawing Stationary Models 100 GALSpecification Drawing Tilting Models Solid Foot DetailOperating Instructions General Care and Cleaning Cleaning InstructionsStainless Steel Equipment Care and Cleaning Product Valve Scraper BladesAgitator Agitator BushingQuad Ring Agitator Seal Assembly Scraper BladesOperating Controls Pressure Relief Assembly Sight GlassHinge Assembly Item no Description QTYWater Meter Assembly Flush Piston Valve Used Prior to Flush Piston Valve Temperature Sensor Assemblies Includes Parts 5Gearmotor Electrical Assembly Kettle Electrical Components Item ON. Part NO. Description QTYKettle GAS Components GAS Orifice Control BOX Electrical Item on Description Control BOX Water Meter & Chart Recorder IndexSide BOX Pneumatics Side BOX Tilt Mechanism Switches Item no Description QTYSocket HD. CAP Screw Maintenance Operating Sequence Heating Kettle Safety Inspection Checklist Safety Thermostat Quad Ring Replacement Procedure AIR Filter Replacement ProcedureNEW Scraper Blade Installation Procedure Lubrication ProcedureBushing Replacement Procedure OIL Filling ProcedureHinge Adjustment Vacuum Leak Test Procedure Repairing Leaks in Steam Jacketed Kettle FittingsKettle Venting Reservoir Fill Procedures Kettle Jacket will Result in Irreversible Damage to UnitPressure Relief Valve Periodic Testing Calibrating Procedure Kettle Jacket Filling & Draining Procedures Recommended Corrosion Inhibitors for Closed SystemsHA Drive Shaft Replacement Procedure Page Field Conversion Instructions Natural Gas to Propane Gas Spare Parts List Part Number Description QuantityAC Inverter Programming Instructions Program Code SummarySTR Wiring Diagram Dual Remote Wiring Diagram Single Remote