
119
| Component | Quantity | Usage | 
| 
 | 
 | 
 | 
| Front brackets | 2 | Attach the mounting rails to the server. | 
| 
 | 
 | 
 | 
| Rear brackets | 2 | 
 | 
| 
 | 
 | 
 | 
| Side handles | 2 | Attach to the sides of the server. | 
| 
 | 
 | 
 | 
| Screw pack | 
 | Secure the different rack components. | 
| 
 | 
 | Refer to the next section for details. | 
| 
 | 
 | 
 | 
Screw types
The following screws are used in the assembly of the Altos G5450 system and bundled 
| Screw type | Quantity Figure | Usage | 
| M6 X 13 | 8 | Install the mounting rails to the | 
| 
 | 
 | rack. | 
| M6 x 18 | 2 | Secure the cable arm to the rack. | 
| M6 cage nut | 2 | Install into the vertical rails of the | 
| 
 | 
 | rack for cable arm support. | 
| Distand | 8 | Install into the vertical rails of the | 
| 
 | 
 | rack for server support. | 
| M4 x 5 | 4 | Secure the mounting rails to the | 
| 
 | 
 | chassis. | 
| 6 | • Secure the rack handles to the | |
| 
 | 
 | chassis (4). | 
• Attach the cable arm to the chassis (2).
