Chapter 2: Broadcom Advanced Control Suite 2 (BACS 2) Applications
The New Team Configuration window opens, as shown in Figure 28.
Figure 28. New Team Configuration Menu
5.Assign any available device or devices to the team by moving the device from the Available Adapters list to the Load Balance Members list.
There must be at least one device in the Load Balance Members list.
Note
There must be at least one Allied Telesyn Gigabit Ethernet adapter assigned to the team.
6.Click Finish.
7.Click Apply.
8.Click Yes when you see the message indicating that the network connection will be temporarily interrupted.
Note
If you disable a virtual team and later want to reenable it, you must first disable and reenable all team members before you reenable the virtual team.
56