16 Installation
Chapter 2 - Hardware Installation
2.2 Installation RequirementsThis section describes all the supplies required to install the Wi² and the items
included in each installation package.
2.2.1 Packing List
The BreezeMAX Wi² and BreezeACCESS Wi² installation kit includes the following
components:
Wi² unit
SU-ODU mounting plate
4 sets of M8 x 16 hex head screws + flat washers + spring washers
4 sets of 1/4” x 1/2” hex head screws + flat washers + spring washers
4 sets of M6 x 12 hex head screws + flat washers + spring washers
Cable kit including a 55 cm category 5E Ethernet cable with two shielded
RJ-45 connectors, one with a metal service box, and a spare shielded RJ-45
connector.
AC power connector
2 x 9/16" (530 mm) metal bands
3m Ethernet configuration cable (2 pairs, straight)
2.2.2 Additional/Optional Installation Requirements
Category 5E cable* for connecting to an SU-ODU if installed separately
(maximum length 100m.)
Rubber sealing cap for BreezeMAX or BreezeACCESS HW Revision E ODU
(supplied with SU-ODU)
Service Box for BreezeACCESS HW Revision D or lower ODU (supplied with
SU-ODU).