Installation
BreezeMAX Wi² and BreezeACCESS Wi² System Manual 27
4Strip insulation from wires as shown in Figure 2-11.
5Insert bare wire ends into the terminals and fully tighten the screws. The wires
should be connected as shown below:
6Draw cable back until socket insert is correctly seated in D-shaped location in
the main body. Tighten the Gland nut. Screw back the locking ring using the
cap assembly tool.
7For an AC cable, connect a mains plug to the other end of the cable. For a DC
cable, connect the appropriate termination.
Figure 2-11: Preparing the Power Cable
AC DC
Brown Phase ~ Red +
Blue Neutral 0 Black -
Yellow/green Grounding