Installation

3.3.2Conduit Entrance Plate in bottom of the system

REAR

UTILITY 1

LEFT

 

RIGHT

UTILITY 2

OUTPUT

DC

0

10.14/257.5

19.78/502.5

30.39/771.9

COM COM

FRONT

Cable entries need to be punched in the UPS cabinet. Follow diagram for correct orientation of power and control cables to be led into the UPS.

990-4049

Installation Guide APC Silcon 240-320kW 480V UPS

11

Page 11
Image 11
American Power Conversion 240-320kW manual Conduit Entrance Plate in bottom of the system, COM COM Front