38 Installation Guide APC Silcon 240-320kW 480V UPS
990-4049
External Connection
4.6.3.7 Installation of Batteries
See Installation Guide for Battery Cabinet for:
Preparing Batteries and UPS
Dimensions and Weight
Connecting Batteries
Diagram - UPS with Battery Cabinet
WARNING!
Before proceding, ensure that power supplies have been disconnected from UPS for a minimum
of 5 minutes.
CAUTION!
Follow Start-up Procedure in the APC Silcon User Guide.
System Integration Interface
Battery Breaker trip for EPO
APC Silcon
UPS
APC Silcon Battery Cabinet