APC 3000 Recommended source connections, Site Preparation UPS and XR - Operating Environment

Models: 3000

1 58
Download 58 pages 30.91 Kb
Page 26
Image 26
Site Preparation (UPS and XR) – Operating Environment

Site Preparation (UPS and XR) – Operating Environment

Recommended source connections

The UPS must be supplied from a 208Y/120V 4W + GND 60Hz source.

CAUTION!

Verify clockwise phase-rotation (L1, L2, L3) and make sure a neutral connection is present.

See also Recommended Wiring for a 86°F (30°C) Temperature Environment.

18

AIS® 3000 10-30kVA, 208V, Site Preparation and Installation Manual – 990-1957

Page 26
Image 26
APC 3000 installation manual Recommended source connections, The UPS must be supplied from a 208Y/120V 4W + GND 60Hz source