Site Preparation Checklist
System components. Have you –
5
5
determined minimum battery runtime requirement based on load (kW and kVA) and selected the correct APC XR Enclosures (ISVTBXR2B6S, ISVTXR2B6S, ISVTBXR6B6S, ISVTXR6B6S) and Battery Unit (SYBT1). Always install a whole Battery Module (4 Battery Units) at a time.
considered Service Program or Extended Warranty plan?
Site Preparation. Have you –
5considered correct operating space, floor strength (see Installation Space Requirements), cooling, and environment (see Operating Environment).
5reviewed all electrical work to determine wiring requirements?
Arrival Preparation. Have you –
5verified that space and handling equipment are available to receive the XR Enclosure? (Including unloading the XR Enclosure from the delivery truck).
5scheduled an authorized electrician to install the XR Enclosure?