Electrical Installation – Communication Wiring to EPO and Optional Equipment
When connecting the Q3 auxiliary signal, use
XR Enclosure, APC MBP, and Generator Control wiring
J106
1
2
3
4
5
6
7
8
J200 (XR Batteries)
1
2
3
4
Q3
switch
Charging control switch
Pins 1 through 4 are for battery measurement (only applicable to APC XR Enclosures). Pins 5 through 6 are for external maintenance bypass Q3.
Pins 7 and 8 are for external charge control.
38 | AIS® 3000 |