APC 3000 installation manual Wiring

Models: 3000

1 58
Download 58 pages 30.91 Kb
Page 39
Image 39
Wiring

Wiring

Make sure the UPS is in its location of use before wiring begins.

CAUTION!

Verify clockwise phase-rotation (L1, L2, L3) and make sure a neutral connection (N) is present.

Power terminal lug diameter: minimum 0.2in/6mm.

Torque value: 45 lbf-in/5Nm

If floor anchoring is required, attach the Floor Anchoring Brackets to the UPS now. Follow step 1 under Floor Anchoring (Option).

Please leave a copy of your wiring diagram with the customer to facilitate maintenance and troubleshooting.

AIS® 3000 10-30kVA, 208V, Site Preparation and Installation Manual – 990-1957

31

Page 39
Image 39
APC 3000 installation manual Wiring