APC 3000 installation manual Leveling Feet

Models: 3000

1 58
Download 58 pages 30.91 Kb
Page 49
Image 49
Leveling Feet

Leveling Feet

Verify that the installation has been electrically wired before setting the leveling feet.

Setting the leveling feet

Set the leveling feet to ensure the UPS is horizontal when it is in its final operating position. Use a 13/ 14-mm wrench (shipped with UPS) to adjust all 4 leveling feet from front to back, and left to right, until the pads make solid contact with the floor. Use a level tube to check the Enclosure is horizontal.

13/14-mm wrench

CAUTION!

To avoid equipment damage, do not push or pull the UPS after the leveling feet have been lowered.

Remember to install the Front Panel. See Front Panel section.

If Floor Anchoring and Battery Securing are required, carry out these procedures first.

AIS® 3000 10-30kVA, 208V, Site Preparation and Installation Manual – 990-1957

41

Page 49
Image 49
APC 3000 installation manual Leveling Feet