APC 3000 installation manual Floor Anchoring option, Floor anchoring of stand-alone systems

Models: 3000

1 58
Download 58 pages 30.91 Kb
Page 50
Image 50
Floor Anchoring (option)

Floor Anchoring (option)

Floor anchoring is an option. If your installation does not include this option, proceed to the Front Panel Installation section.

Floor anchoring of stand-alone systems

In seismic areas, it is recommended that the installation be bolted to the floor, and that the batteries be secured in the Enclosure by the Battery Securing Brackets.

For floor anchoring, use the 2 transport brackets that were used to secure the UPS to the pallet during transport.

BATTERY UNIT

BATTERY UNIT

 

BATTERY UNIT

BATTERY UNIT

BATTERY UNIT

BATTERY UNIT

 

BATTERY UNIT

BATTERY UNIT

Floor Anchoring Bracket (re-use of transport bracket)

 

BATTERY UNIT

BATTERY UNIT

 

 

 

 

BATTERY UNIT

 

 

BATTERY UNIT



 



 

 





 



 

 

Align the 4 holes in the bottom angle of the Floor Anchoring Bracket on either side of the UPS to the pre-drilled holes in the floor

Floor anchoring procedures identical for both 13.85in/352mm and 20.59in/523 mm UPS Enclosures.

See Floor Anchoring Preparation section and install a minimum of 4 anchors on each Enclosure (minimum size: M8) where shown, following the specifications provided by the manufacturer.