Site Preparation and Installation Manual
10-30kVA 208V
Page
Site Preparation and Installation Manual
IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS
followed during installation and maintenance of the UPS and batteries
AIS 3000 10-30kVA
Page
Site Preparation UPS and XR
Introduction
Contents
Electrical Installation
Communication Wiring to EPO and Optional Equipment
General Charge Setting
Wiring Verification Procedure Installation Site Checklist
LIMITED FACTORY WARRANTY
Page
Introduction
General Safety Instructions
13.85in/352mm Enclosures
UPS Family Range and Components
20.59in/523mm Enclosures
System sizes, part nos., number of Battery Modules and weights
I S V T 1 0 K F 1 B 2 S
Part number coding
Introduction - UPS Family Range and Components
Battery Module
Front Panel attachment procedure described in the Front Panel section
Conduit Box
Front Panel overview
Stabilizing Bracket
Service port for APC maintenance personnel only
Extended Run Battery Enclosure XR Enclosure and Battery Module
Options
XR Enclosure weights
Part Number for Battery Module
Maintenance Bypass Panels with Power Distribution Capability
Battery Module weight
Battery Module
Floor anchoring and battery securing equipment
Battery Securing Bracket
MBP wall-mount 37.36in 949mm
29.53in/ 750mm
Installation Space Requirements
Site Preparation UPS and XR
Clearance for 20.59in/523mm Enclosures
Space requirements
B UPS XR C C E
Site Preparation UPS and XR - Installation Space Requirements
A Conduit Box F D G
Site Preparation UPS and XR - Installation Space Requirements
Clearance for stand-alone 13.85in/352mm Enclosures
Space requirements
Stabilizing Bracket, left and right
Site Preparation UPS and XR - Installation Space Requirements
Space requirements
B UPS XR C2 C1 E
A Conduit Box F G
Floor Anchoring Preparation
Recommended floor bolt size 5/16in/8mm
Operating Environment
Operating conditions
Heat dissipation
Audible noise
Recommended source connections
The UPS must be supplied from a 208Y/120V 4W + GND 60Hz source
See also Recommended Wiring for a 86F 30C Temperature Environment
Site Preparation UPS and XR - Operating Environment
customer
Minimum setting of breakers for 10kVA UPS
Minimum setting of breakers for 15kVA UPS
Overload
Mains input
Minimum setting of breakers for 20kVA UPS
Minimum setting of breakers for 30kVA UPS
Overload
Mains input
phase current
Basic Wiring Overview
AC input power DC power Communication Interface
AC power output
Maintenance Bypass Panel Optional Equipment
Site Preparation Checklist
System components. Have you
Site Preparation. Have you
Arrival Preparation. Have you
Electrical Installation
Front Panel
Installation
Electrical Installation - Front Panel
Total-Power-Off Procedure
Utility/Mains breaker
Electrical Installation - Total-Power-Off Procedure
System-Electrical Information
UPS ratings
Electrical Installation - System-Electrical Information
Source connections
Wiring
Conduit box
Input/Output Wiring - Single Mains default
bottom part
Attach the Conduit Box bottom to the Enclosure, using 4 M4x13 screws
Input/Output Wiring - Dual Mains
Electrical Installation - Input/Output Wiring - Dual Mains
Communication Wiring to EPO and Optional Equipment
Pin connections J106 XR Enclosure and J108 EPO
Pin connections J106 UPS to J200 XR Enclosure - option
J106 Pin Connections
J108 Pin Connections
Pins 7 and 8 are for external charge control
See EPO wiring options for setup
Pin connections J108 for EPO wiring options
Electrical Installation - Communication Wiring to EPO and Optional
General Charge Setting
Leveling Feet
Floor Anchoring option
Floor anchoring of stand-alone systems
Battery securing
Electrical Installation - Floor Anchoring option
Bypass Input for dual mains installations
Wiring Verification Procedure
Mains Input
5 10. Reinstall all wiring access panels and Front Panels to the UPS
Installation Site Checklist
LIMITED FACTORY WARRANTY
period
Warranty claims procedure
Electrical Installation - LIMITED FACTORY WARRANTY
Drawings, descriptions
Exclusions
SERVICE IN CONNECTION WITH THE PRODUCTS. THE FOREGOING WARRANTIES AND REMEDIES ARE EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES AND REMEDIES. THE WARRANTIES SET FORTH ABOVE, CONSTITUTE SOLE LIABILITY OF APC AND YOUR EXCLUSIVE REMEDY FOR ANY BREACH OF SUCH WARRANTIES. THE WARRANTIES EXTEND ONLY TO YOU AND ARE NOT EXTENDED TO ANY THIRD PARTIES