Electrical Installation – Input/Output Wiring – Dual Mains
Punch 3 holes in the Conduit Box bottom to fit the size of the conduit pipes.
Attach the Conduit Box bottom to the Enclosure, using (4) M4x13 screws.
Install conduit pipes in the Conduit Box bottom.
Run cables through the conduit pipes and the bottom of the Conduit Box. Guide the cables up into the input/output area.
Install the top part of the Conduit Box to the Enclosure.
Remove the (2) M6x12 screws from Brackets A, B, and C and remove all 3 brackets.
Input
Neutral Bypass
Output
Ground
L1
L2 L3
N N
L1
L2
L3
L1
L2 |
|
L3 | Batt+ |
N |
|
| Batt- |
Plate covering cable termination area
Attach the input cable lugs to input busbars L1, L2, L3, using the provided hex screws. Attach the bypass cable lugs to L1, L2, L3 bypass busbars, using the provided hex screws. Attach the output cable lugs to the L1, L2, L3 output busbars and attach, using the provided hex screws.
Attach N x 3 where shown., using the provided hex screws.
Attach Ground x 3 where shown.
Reinstall the Plate, following reversed deinstallation procedures (described in a previous step).
AIS® 3000 | 35 |