Start Up Displays

ENTER

IFR Output

Tests

4.After entering the Seed Position, you will be prompted next to clear the active flight plan. Choose Yes or No with the SMALL knob. Press ENTER to continue normal operations.

Clear Active

Flight Plan

NO?

A series of tests covering connections for IFR flight are tested if your Apollo GX has been installed and configured for IFR flight.

Starting IFR

Output Tests

After the completion of all tests the Apollo GX will start normal navigation operation.

CDI Output Tests

The CDI (Course Deviation Indicator) outputs are tested first. Each of the following displays is shown for two seconds, during which the external CDI needle should be driven as indicated by the display, which is up to the user to verify.

CDI Tests

CDI Full Right

CDI tests and display screens are provided for CDI Full Right, CDI Half Right, CDI Centered, CDI Full Left, and CDI Half Left.

TO/FROM Flag Output Tests

The To/From Flag outputs are tested next. Each of the following displays is shown for three seconds, during which the external To/From flag should be driven as indicated by the display, which is up to the user to verify.

11-8