Belkin F1DP108G user manual Powering Up the Systems, Local Installation

Models: F1DP108G

1 84
Download 84 pages 11.57 Kb
Page 25
Image 25
Step 4  Powering Up the Systems

Local Installation

Step 4 Manual background Powering Up the Systems

4.1If you have not already done so, power on all servers connected to the Switch (servers can be powered on simultaneously). The Switch emulates both a mouse and keyboard on each port and allows your server to boot normally. The server connected to port 1 will be displayed on the monitor.

4.2Check that the keyboard, monitor, and mouse are working normally.

4.3Using the port selectors, check all occupied ports to verify that all servers are connected and responding correctly. If you encounter an error, check your cable connections for that server and reboot. If the problem persists, please refer to the “Troubleshooting” section in this User Manual.

22

Page 25
Image 25
Belkin F1DP108G user manual Powering Up the Systems, Local Installation