Fault Isolation Procedures

Power-Up Sequence Test

Step A

Procedure

Condition

Action

 

 

 

 

1.Before performing this test, the Electrical Pretest must pass.

2.Key on.

3. Observe the Driver

 

If lights turn on the go off

 

Test complete.

Display Unit.

 

after approximately 15

 

 

 

 

 

 

 

seconds

 

 

 

 

Note: Not applicable for

 

 

 

 

Freightliner IDI

 

 

 

 

If lights fail to turn on

 

Go to Step B.

 

 

If lights turn on and stay on

 

Go to Step C.

 

 

 

 

 

 

 

 

Step B

Procedure

Condition

Action

 

 

 

 

1.Key on.

2.Disconnect the 4-way connector from the Driver Display Unit.

Note: Not applicable for

Freightliner IDI.

3. Measure voltage

 

If voltage is between 7.0

 

Go to Step C.

between pins C and D

 

and 7.5 volts

 

 

 

 

 

on the Driver Display

 

 

 

 

Unit 4-way connector.

 

 

 

 

 

 

If voltage is outside of

 

Go to Step G.

 

 

range

 

 

 

 

 

 

 

 

 

 

VOLT

 

D

C

B

A

 

 

 

 

 

V

COM

A

Power-Up Sequence Test

2-6

Page 17
Image 17
BENDIX BW2849 manual Power-Up Sequence Test, Key on Observe the Driver If lights turn on the go off