BENDIX BW2849 manual Key off Reconnect all connectors Key on, Clearing on If code appears

Models: BW2849

1 114
Download 114 pages 4.32 Kb
Page 28
Image 28

Fault Isolation Procedures

Power-Up Sequence Test, continued

Step V

Procedure

Condition

Action

 

 

 

 

1.Key off.

2.Reconnect all connectors.

3.Key on.

4.Clear Codes. See “Fault Code Retrieval and Clearing” on page 2.

5.Use Driving Techniques to attempt to set a code. See “Driving Techniques” on page 4.

6. Check for Codes. See

If no codes

 

Test complete.

“Fault Code Retrieval and

 

 

 

 

 

 

 

 

Clearing” on page 2.

 

 

 

Note: If problem still exists there

If code appears

 

See “Fault Code Isolation

may be a software

 

 

Procedure Index” on page 3.

 

 

compatibility problem.

 

 

 

Contact your Bendix

 

 

 

representative.

 

 

 

2-17

Page 28
Image 28
BENDIX BW2849 Key off Reconnect all connectors Key on, Check for Codes. See If no codes Test complete, May be a software